Is bed-space rental allowed in Dubai?
Bed-space rental is allowed only as permitted shared accommodation, in an allowed area, with 5 m² per person, DCD approval and the DM permit.
The short answer
Bed-space rental is shared housing, so the DM rules apply (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026): the property must be in an allowed area, set as individual housing (not on the four family-only roads), with at least 5 m² per person, the required facilities, DCD approval and the permit. Without these it is a violation, with fines from AED 500 to AED 500,000. Existing bed-space properties must regularise by 8 September 2027.

Official sources: Dubai Municipality · Dubai Civil Defence · Khaleej Times report on the DM circular
Bed-space rental: what you need to know
- Allowed areas only: 28 fully and 11 partly allowed areas.
- 5 m² per person: Minimum bedroom area.
- One category: Individual or family, not mixed.
- DCD and DM: Both approvals are required.
What to send us
- Title deed (owner), or tenancy contract with owner NOC (tenant)
- Emirates ID or passport
- Affection plan or site plan
- Existing drawings, if available; we can survey
- Photos of the rooms and facilities
- Trade licence, if a company owns or operates the property
Who does what
From check to permit
The order of the DCD and DM steps can vary; we confirm it for your property.
| Step | Approval route | Guides |
|---|---|---|
| Check the area and category You and us | Confirm the property is in an allowed area, and choose individual or family housing. | Allowed areas |
| Owner NOC (tenants) Owner | A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed. | Tenants |
| Survey and layout drawings Structural Solutions | Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry. | Layout drawings |
| Structural check Structural Solutions | Partitions and any added loads are checked by our engineers. | — |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval for the shared accommodation. | DCD approval |
| Shared accommodation permit Structural Solutions → Dubai Municipality | The permit to operate the property as shared accommodation. | The permit |
How it works
How it works
1. Check
Area, category and occupancy for your property.
2. Drawings
Survey and layout drawings to the DM rules.
3. Approvals
DCD approval and the DM shared accommodation permit.
4. Operate
Rent the property as permitted shared accommodation.
Questions
More questions about bed-space rental
Is bed-space rental legal in Karama?
Karama is allowed, with the permit and approvals.
Is it allowed in JLT?
JLT is not on the list.
How many beds per room?
Room area divided by 5.
Can a tenant run it?
With the owner NOC and the permit.
Related guides
