How to Calculate Wind Load on a Billboard
Wind load on a billboard is worked out from the design wind pressure at the board height, the area of the board and a force coefficient for its shape, as per the Dubai Building Code. That force then flows down through the frame, the connections, the base plate and the foundation or roof, and every part is checked.
In short: find the design wind pressure for the site and height, multiply by the exposed area and the force coefficient for a flat board, then place that force at the centre of the board. The result gives the shear and the overturning moment that the pole, the anchors and the foundation must resist.
The method
Step by step
General method. Values are taken from the Dubai Building Code for each site; we do not publish set figures.
| Step | What is worked out |
|---|---|
| 1. Design wind speed | Taken from the Dubai Building Code for the location |
| 2. Height and terrain | Wind is stronger higher up and in open ground |
| 3. Wind pressure | From the wind speed, height and terrain |
| 4. Force on the board | Pressure x board area x force coefficient |
| 5. Load cases | Wind straight on and at an angle, which twists the board |
| 6. Down to the base | Shear and overturning moment at the pole base |
What is checked
Where the force goes
| Part | Check |
|---|---|
| Board frame | Bending of the members between supports |
| Pole or legs | Bending, buckling and deflection |
| Connections | Bolts and welds; see connection design |
| Base plate and anchors | Anchor bolt tension; see base plates |
| Foundation or roof | Overturning, sliding and bearing; see foundations |
Official sites: Dubai Municipality | RTA | Dubai Building Code
What you need to know
- Dubai Building Code: the design basis for the authority submission.
- Height matters: wind pressure rises with height.
- Angled wind twists the board, not only pushes it.
- Stamped: the authority needs calculations stamped by the engineer.
Documents you will need
- Sign or billboard drawings (size, height, materials)
- Location and photos
- Supplier data for LED screens or panels
- Landlord or building owner consent where needed
How it works
How we prepare billboard wind load calculations
1. Drawings
Board size, height, frame.
2. Site
Location and exposure.
3. Wind load
As per the Dubai Building Code.
4. Structure
Frame to foundation.
5. Stamp
Calculations stamped.
6. Submit
With the permit file.
Questions
Questions owners ask
How do you calculate wind load on a billboard?
Design wind pressure for the site and height, times the board area, times a force coefficient. The force is then followed down to the foundation.
Which code is used in Dubai?
The Dubai Building Code. See which code applies.
Is the wind load the same for every billboard?
No. It changes with the height, the size, the shape and the site.
Can I use a generic wind calculator?
Not for the authority submission. It needs calculations stamped by the engineer.