Which Code Is Used for Wind Load in Dubai?
Structures in Dubai, including billboards, signs and canopies, are designed for wind as per the Dubai Building Code. The code sets the design wind for the site, and the calculations submitted to the authority follow it. International codes are only used where the Dubai Building Code points to them.
For an authority submission in Dubai, the reference is the Dubai Building Code. A calculation done only to another country's code, or with a generic calculator, is not what the authority reviews.
In practice
What this means for your project
| Situation | What to do |
|---|---|
| New billboard or sign | Wind load as per the Dubai Building Code |
| Supplier calculations from abroad | Checked and redone to the Dubai Building Code |
| Old structure designed years ago | Checked against the current code when it changes |
| Generic calculator result | Not for the authority submission |
Official sites: Dubai Municipality | RTA | Dubai Building Code
What you need to know
- Dubai Building Code is the reference.
- Site and height set the design wind.
- Foreign calcs are checked again.
- Stamped for the authority.
Documents you will need
- Sign or billboard drawings (size, height, materials)
- Location and photos
- Supplier data for LED screens or panels
- Landlord or building owner consent where needed
How it works
How we handle it
1. Site
Location and height.
2. Code
Dubai Building Code wind.
3. Loads
Wind and weight.
4. Structure
Checked.
5. Stamp
By the engineer.
6. Submit
To the authority.
Questions
Questions owners ask
Which wind code is used in Dubai?
The Dubai Building Code.
Can I use ASCE 7 or Eurocode calculations?
The submission follows the Dubai Building Code. Calculations to other codes are checked and redone to it.
What design wind speed is used in Dubai?
It is taken from the Dubai Building Code for each site and height; our engineers apply it in the calculations.
Who can help?
Our engineers prepare the wind load and structural calculations, stamp them for the authority submission and support the approvals. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
