Shared Housing · Questions

How many people can live in a 1-bedroom apartment in Dubai?

In a 1-bedroom apartment used as shared housing, the bedroom must give at least 5 m² per person: a 12 m² bedroom holds two, 15 m² three.

The short answer

In shared housing, the DM rules (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026) set a minimum of 5 m² of bedroom per person. For a 1-bedroom apartment, divide the bedroom area by five: 10 to 14 m² for two people, 15 to 19 m² for three. The apartment must also have the kitchen, bathroom, dining, recreation and laundry facilities, be in an allowed area, and have DCD approval and the DM permit.

Rule5 m² per person
12 m² bedroom2 people
15 m² bedroom3 people

1-bedroom apartment: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about 1-bedroom apartment

Can people sleep in the living room?

The rule is for bedrooms; the living room serves as dining and recreation.

Is this for families too?

It applies to shared housing.

Who measures?

We survey the apartment.

Do I need a permit?

Yes, for shared housing.

Related guides

Keep reading