Shared Housing · Main Roads

Which Dubai roads allow family shared housing only?

Family housing only applies on Bani Yas Road, Sheikh Zayed Road, Jumeirah Road and Al Wasl Road, under the Dubai Municipality shared housing rules.

The short answer

The DM circular (reported by Khaleej Times on 8 October 2026) restricts shared housing on four major roads, described as tourist and commercial areas, to family housing only: Bani Yas Road, Sheikh Zayed Road, Jumeirah Road and Al Wasl Road. Individual shared housing is not allowed on these roads. A villa or apartment on these roads, in an allowed area, can still be used as family shared housing with the permit and DCD approval.

Roads4 main roads
AllowedFamily housing only
Not allowedIndividual housing

Family housing only: what you need to know

  • Bani Yas Road: Family housing only.
  • Sheikh Zayed Road: Family housing only.
  • Jumeirah Road: Family housing only.
  • Al Wasl Road: Family housing only.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about family housing only

Can I rent rooms to individuals on Al Wasl Road?

No, only family housing is allowed there.

Does this apply to villas and apartments?

It applies to the properties on these roads.

Is the area still required to be on the list?

Yes, the area must also be allowed.

Do I still need DCD?

Yes, DCD approval is required.

Related guides

Keep reading