Wind load · Windows and doors

Aluminium Window and Door Wind Load Calculations in Dubai

Large glazing and sliding doors must resist wind at their height and exposure.

Aluminium windows and doors in Dubai are checked for wind pressure and suction: the glass, the frames and mullions, and the anchors into the wall or slab. The higher and more exposed the opening, the higher the wind load, so towers and large sliding doors need particular care. Our engineers calculate the loads and issue stamped calculations for the developer, building management or authority submission.

Aluminium Window and Door Wind Load Calculations in Dubai

Official sources: Dubai Municipality · DDA

What we check

  • Glass: Thickness and type
  • Frames: Mullions and transoms
  • Anchors: Into wall or slab
  • Height: Floor and exposure
  • Size: Large panels
  • Report: Stamped

Documents you will need

  • Drawings or a sketch with sizes
  • Material and profile details
  • Location and height
  • Photos of the supporting structure

Process

How we prepare the calculations

The general process. We confirm what your submission needs.

StepApproval routeGuides
Details
You
Drawings, sizes, materials and location.—
Wind loads
Our engineers
Pressure and suction for the location and height.—
Members
Our engineers
Glass, frames and mullions checked for the wind.—
Fixings
Our engineers
Anchors into the wall or slab designed.—
Report
Structural Solutions
Stamped calculations and details.—
Submission
Approving body
With the NOC, permit or approval.—

How it works

How we work

1. Send us the details

Drawings, sizes and location.

2. Site

Height and supporting structure.

3. Loads

Wind pressure and suction.

4. Design

Members and fixings.

5. Report

Stamped calculations.

6. Submission

Comments answered.

What causes problems

  • Anchors not designed
  • Glass too thin for the height
  • Frames without calculations

Need wind load calculations?

Get a stamped report for your submission

Send us three things on WhatsApp:

  1. Structure and size
  2. Materials
  3. Location and height

Our engineers calculate the wind loads, check the fixings and prepare the report.

Questions

Questions

Do I need calculations for new windows?

Where the developer, building or authority asks for them, usually for larger or higher openings.

Does the floor level matter?

Yes. Wind is stronger higher up.

What if windows were already replaced?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading