As-Built Survey in Dubai
When the approved drawings are missing or the property has changed, we survey it and draw it as it is today.
An as-built survey records a property exactly as it stands: our engineers measure every floor, the outside walls and the structure, then prepare architectural and structural as-built drawings. It is needed when the approved drawings are missing, the property has changed since handover, or before an extension, wall removal, regularisation or completion. We first try to obtain the existing approved drawings for you; if there are none, or they no longer match, we survey. You receive PDF, and CAD where applicable.

Official sources: Dubai Municipality · DDA
What we check first
- Floors: Measured room by room
- Walls and openings: Positions and sizes
- Structure: Columns, beams, slabs
- Changes: Against approved drawings
- Format: Developer or authority format
- Files: PDF and CAD
Documents you will need
- Title deed or tenancy contract
- Owner or tenant ID
- Affection plan or plot number
- Existing drawings, if available
Route
From existing drawings to as-built set
The general route. We confirm it for your property.
| Step | Approval route | Guides |
|---|---|---|
| Obtain existing drawings Structural Solutions | We request the approved drawings from the developer or authority on your behalf. | Getting your drawings |
| Site survey Our engineers | Measured survey of every floor and the structure. | — |
| Architectural drawings Structural Solutions | Plans, elevations and sections as built. | — |
| Structural drawings Structural Solutions | Columns, beams, slabs and wall types. | — |
| Comparison Our engineers | Differences from the approved drawings, if any. | — |
| Use You and the authorities | NOC, permit, GFA, buying or selling. | — |
How it works
How we work
1. Send us the details
Property, area and what you need.
2. Check
Route and documents confirmed.
3. Site
Visit or survey if needed.
4. Drawings
Prepared by our engineers.
5. Submission
By us, to each body.
6. Follow-up
Comments until approval.
Related questions
What causes problems
- Designing from old plans
- Changes since handover not shown
- Area measured wrongly
Need this approval?
Get your route confirmed
Send us three things on WhatsApp:
- Property and area
- What you want to do
- Any documents you have
Our engineers confirm the route, prepare the drawings and handle the submissions.
Questions
Questions
Do I always need a survey?
No. If the approved drawings exist and match the property, we obtain them for you.
What do you need from me?
Title deed, Emirates ID or passport and a signed authorisation letter.
Which properties?
Villas, apartments, shops, offices and warehouses, anywhere in Dubai.
What if the survey shows unapproved works?
Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
