Do I need a consultant for a shared housing permit in Dubai?
A consultant for a shared housing permit prepares the layout and fire safety drawings, checks the structure and submits to DCD and Dubai Municipality.
The short answer
The permit depends on drawings that prove the rules are met (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026): bedrooms at 5 m² per person, the facilities, the category, and a fire and life safety layout for Civil Defence. Structural Solutions surveys the property, prepares and stamps the drawings, checks partitions and loads, and handles DCD approval and the DM permit for owners and tenants.

Official sources: Dubai Municipality · Dubai Civil Defence · Khaleej Times report on the DM circular
Consultant for a shared housing permit: what you need to know
- Allowed areas only: 28 fully and 11 partly allowed areas.
- 5 m² per person: Minimum bedroom area.
- One category: Individual or family, not mixed.
- DCD and DM: Both approvals are required.
What to send us
- Title deed (owner), or tenancy contract with owner NOC (tenant)
- Emirates ID or passport
- Affection plan or site plan
- Existing drawings, if available; we can survey
- Photos of the rooms and facilities
- Trade licence, if a company owns or operates the property
Who does what
From check to permit
The order of the DCD and DM steps can vary; we confirm it for your property.
| Step | Approval route | Guides |
|---|---|---|
| Check the area and category You and us | Confirm the property is in an allowed area, and choose individual or family housing. | Allowed areas |
| Owner NOC (tenants) Owner | A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed. | Tenants |
| Survey and layout drawings Structural Solutions | Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry. | Layout drawings |
| Structural check Structural Solutions | Partitions and any added loads are checked by our engineers. | — |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval for the shared accommodation. | DCD approval |
| Shared accommodation permit Structural Solutions → Dubai Municipality | The permit to operate the property as shared accommodation. | The permit |
How it works
How it works
1. Check
Area, category and occupancy for your property.
2. Drawings
Survey and layout drawings to the DM rules.
3. Approvals
DCD approval and the DM shared accommodation permit.
4. Operate
Rent the property as permitted shared accommodation.
Questions
More questions about consultant for a shared housing permit
What do you prepare?
Survey, layout drawings, fire safety layout, structural check.
Do you submit?
Yes, to DCD and DM.
Do you work with tenants?
Yes, with the owner NOC.
Do you show fees online?
We send a quote after reviewing the property.
Related guides
