Do I need a consultant for a shared housing permit in Dubai?

A consultant for a shared housing permit prepares the layout and fire safety drawings, checks the structure and submits to DCD and Dubai Municipality.

The short answer

The permit depends on drawings that prove the rules are met (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026): bedrooms at 5 m² per person, the facilities, the category, and a fire and life safety layout for Civil Defence. Structural Solutions surveys the property, prepares and stamps the drawings, checks partitions and loads, and handles DCD approval and the DM permit for owners and tenants.

Allowed areas28 fully, 11 partly
Room size5 m² per person
Deadline8 September 2027

Consultant for a shared housing permit: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about consultant for a shared housing permit

What do you prepare?

Survey, layout drawings, fire safety layout, structural check.

Do you submit?

Yes, to DCD and DM.

Do you work with tenants?

Yes, with the owner NOC.

Do you show fees online?

We send a quote after reviewing the property.