DEWA New Connection in Dubai: How to Apply
Building a new villa or building, or bringing power to a plot for the first time? You need a DEWA new connection. Here is how it works, what DEWA needs, and how we handle it for you.
DEWA new connection
A DEWA new connection gives a new villa, building or plot its power supply. DEWA approves it based on the electrical load and the electrical drawings. We calculate the load, prepare the electrical drawings and load schedule to DEWA requirements, submit them to DEWA and answer any comments until approval. The connection works and DEWA inspection follow before the power is connected.

Official sources: Dubai Electricity and Water Authority (DEWA) · Dubai Municipality
What the new connection application covers
- Electrical load: Total load of the property
- Load schedule: Breakdown by circuit and equipment
- Electrical drawings: To DEWA requirements
- Supply point: Where the power comes in
- Inspection: Before the power is connected
Documents you will need
- Affection plan and title deed
- Approved building drawings
- Owner ID or trade licence
- Details of major equipment, if any
How it works
How the DEWA new connection works
1. Your property
Plot, type and use.
2. Load calculation
The total electrical load and the load schedule.
3. Electrical drawings
Prepared to DEWA requirements.
4. Submission
We submit to DEWA.
5. DEWA review
Comments answered and resubmitted if needed.
6. Approval
Then the connection works and DEWA inspection.
DEWA guides
- DEWA connection NOC
- DEWA load increase for a villa
- DEWA approval types
- DEWA approval services
What delays a new connection
- Load calculation missing or incomplete
- Drawings not to DEWA requirements
- Building drawings not approved yet
- Major equipment loads left out
Need a DEWA connection?
Get your power supply approved
Send us three things on WhatsApp:
- Your affection plan or title deed
- The property type and area
- The approved drawings, if you have them
We prepare the electrical drawings and load calculations and submit them to DEWA for you.
Questions
DEWA new connection questions
How do I apply for a DEWA new connection?
We calculate the electrical load, prepare the electrical drawings and load schedule, and submit them to DEWA for you.
Who submits the application to DEWA?
We do. We prepare and submit the drawings and load calculations.
What does DEWA need?
The electrical load, the load schedule and the electrical drawings, with the property documents.
What is the DEWA connection NOC?
It is DEWA’s NOC for the new power supply. See our DEWA connection NOC guide.
Is there an inspection?
Yes, DEWA inspects before the power is connected.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.