DEWA Connection NOC in Dubai: The NOC for a New Power Supply
The DEWA connection NOC is DEWA’s NOC for a new power supply. It is what a new villa, building or plot needs before the power can be connected. Here is what it covers and how we get it.
DEWA connection NOC
When people ask for the DEWA connection NOC, they mean DEWA’s NOC for a new power supply. To get it, DEWA reviews the electrical load and the electrical drawings for the property. We calculate the load, prepare the drawings and load schedule, submit them to DEWA and answer the comments until the NOC is issued. The connection works and DEWA inspection follow.

Official sources: Dubai Electricity and Water Authority (DEWA) · Dubai Municipality
What DEWA reviews for the NOC
- Load: Total electrical load
- Load schedule: Breakdown by circuit
- Drawings: Electrical layout to DEWA requirements
- Supply: Point of connection
Documents you will need
- Affection plan and title deed
- Approved building drawings
- Owner ID or trade licence
How it works
How we get the DEWA connection NOC
1. Your property
Plot, type and use.
2. Load calculation
The total electrical load and the load schedule.
3. Electrical drawings
Prepared to DEWA requirements.
4. Submission
We submit to DEWA.
5. DEWA review
Comments answered and resubmitted if needed.
6. Approval
Then the connection works and DEWA inspection.
DEWA guides
- DEWA new connection
- DEWA load increase for a villa
- Building management vs DEWA vs developer NOC
- DEWA approval services
Common reasons DEWA returns it
- Load calculation incomplete
- Drawings not to DEWA requirements
- Property documents missing
Need a DEWA connection?
Get your power supply approved
Send us three things on WhatsApp:
- Your affection plan or title deed
- The property type and area
- The approved drawings, if you have them
We prepare the electrical drawings and load calculations and submit them to DEWA for you.
Questions
DEWA connection NOC questions
What is the DEWA connection NOC?
DEWA’s NOC for a new power supply to a villa, building or plot.
Who applies for it?
We prepare the load calculations and drawings and submit them to DEWA.
Is it the same as a load increase?
No. A load increase adds power to an existing connection. The connection NOC is for a new supply.
What comes after the NOC?
The connection works and DEWA inspection before the power is connected.