How do I increase my DEWA load for a restaurant?
Where the kitchen or fit-out needs more electrical load, a DEWA load increase approval is needed, alongside the landlord NOC and the fit-out approvals: the building authority, DM Food Safety and DCD.
New kitchen equipment, extraction and air conditioning can need more electrical load than the unit has. The load increase is approved by DEWA as part of the restaurant fit-out, together with the landlord or mall NOC, the building authority approval, the DM Food Safety layout approval and DCD.
What goes with it
- Landlord NOC: The landlord or mall approves the fit-out.
- Food Safety: DM Food Safety layout approval; any update needs re-approval.
- DCD: Every restaurant needs DCD approval.
- Gas: Gas works by a DCD-approved third party.
Documents you will need
- Trade licence and tenancy contract (Ejari)
- Landlord or building management NOC
- Fit-out drawings and stamped calculations
- Fire safety drawings
- Photos of the unit
Who does what
Step by step
The order can vary by community and authority; we confirm it for your project.
| Step | Approval route | Guides |
|---|---|---|
| Load check Consultant | Confirm the extra load needed. | — |
| Landlord NOC Landlord or mall | Approval of the fit-out. | — |
| DEWA DEWA | Load increase approval. | Restaurant load increase |
| Other approvals DM Food Safety, DCD | Layout and fire safety. | Restaurant approvals |
Questions
Related questions
Does a restaurant fit-out need a DEWA load increase?
Where the equipment needs more load than the unit has.
Does every restaurant need DCD?
Yes.
Does a layout change need Food Safety re-approval?
Yes, any update needs re-approval.
Is it different in TECOM?
The same DEWA step applies; the fit-out goes through DDA.
What does Structural Solutions do?
We coordinate the fit-out approvals and the DEWA step.
Related guides
