Contractor Abandoned the Project: Dubai Permit
If the contractor has left the site, the change can go ahead without it.
Structural Solutions is a Dubai engineering consultancy. We prepare the technical report and the application, and submit the contractor change for you, with or without the outgoing contractor’s agreement. If the contractor has stopped work or cannot be reached, the application goes in without its signature, with the reasons. If it does not respond within the time Dubai Municipality sets, up to 5 working days, the change is approved and the new permit is issued after the handover period.

Official sources: Administrative Resolution No. 275 of 2024 · Dubai Municipality
What we check
- Site record: Stage of the works
- Drawings: Built vs approved
- Permit: Current contractor and consultant
- Agreement: Does the contractor agree?
- New contractor: Licence, classification, insurance
- Developer: Informed where there is one
Documents you will need
- Building permit number and approved drawings
- Owner ID and title deed
- New contractor’s trade licence and insurance policy
- Reasons for the change, if the contractor does not agree
Dubai law
What Dubai law says about changing a contractor
Contractor and consultant changes on a Dubai Municipality building permit follow Administrative Resolution No. 275 of 2024, issued by Dubai Municipality on 6 August 2024.
With the contractor’s agreement
One application is signed by the engineering consultant, the outgoing contractor and the new contractor. It includes the owner’s declaration and a technical report from the consultant on the stage of the works and whether they match the permit and the approved drawings. The new contractor endorses the report.
Without the contractor’s agreement
The application is signed by the consultant and the new contractor. It includes the owner’s declaration, a clear statement of the reasons for the change, and the consultant’s technical report. Dubai Municipality asks the outgoing contractor to respond within a time limit of no more than 5 working days.
If it is a money or contract dispute
If the dispute is financial or contractual, or the outgoing contractor does not respond in time, Dubai Municipality approves the change and gives the outgoing contractor up to 30 days to hand over the site. The new permit is then issued in the new contractor’s name. If the dispute is technical, Dubai Municipality reviews the case and approves or rejects the change.
What the new contractor needs
The new contractor must be licensed, with a classification not lower than the building’s, and must submit the insurance policy required by law. It cannot start work until the new permit is issued in its name.
Changing consultant and contractor together
If both the consultant and the contractor are changed without their agreement, the new consultant prepares the technical report, and the new contractor’s permit is issued once the consultant change is complete.
Who can apply
The owner can also apply for the change. In practice the consultant prepares the technical report and the application.
Our role: as your consultant, we inspect the site, record the works done against the approved drawings, prepare the technical report and the owner’s declaration, and submit the change. If your current consultant is not cooperating, we can take over as the replacement consultant and prepare the report ourselves.
Route
The Dubai Municipality contractor change route
With or without the outgoing contractor’s agreement.
| Step | Approval route | Guides |
|---|---|---|
| Site record Our engineers | Technical report: stage of the works and whether they match the permit and the approved drawings. | — |
| Owner declaration Owner | Approves the change and appoints the new contractor. | — |
| Application Consultant and new contractor | The outgoing contractor signs too if it agrees; if not, the reasons are stated. | Contractor not releasing the permit |
| Response Outgoing contractor | Without agreement: up to 5 working days to respond. | Contractor disputes |
| New permit Dubai Municipality | Issued in the new contractor’s name, after the fees and its insurance policy. | — |
| Works resume New contractor | Only after the new permit, to the approved drawings. | Continuing construction |
How it works
How we handle it
1. Send us the details
Permit number, area and what happened.
2. Site visit
Our engineers record the works done.
3. Technical report
Stage of the works vs the approved drawings.
4. Application
With your declaration, and the reasons if needed.
5. Submission
By us, with follow-up on comments.
6. New permit
In the new contractor’s name.
What causes problems
- Restarting works before the new permit
- No record of the works left behind
- Reasons for the change not written down
Need help with this?
Get your contractor change moving
Send us three things on WhatsApp:
- Your building permit number and area
- What happened with the current contractor or consultant
- Photos of the site and any approved drawings
Our engineers inspect the site, prepare the technical report and submit the change for you.
After the contractor left
Getting the completion certificate (BCC) after the contractor abandoned the project
The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
Once the remaining works are finished, the file still has to pass the final inspections. On Dubai Municipality permits, the owner and the consultant can apply without the old contractor’s consent. We audit what is on site against the approved drawings, prepare the as-built drawings and close the permit.
- My contractor can’t get the completion certificate
- Completion certificate takeover service
- Contractor holding the documents
- Site rectification for completion
- Completion file audit
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Questions
Can I get the completion certificate (BCC) if my contractor abandoned the project?
Yes, in most cases. The works are finished by a new contractor where needed, then we prepare the completion file. See My contractor can’t get the completion certificate.
What if I cannot reach the contractor?
Dubai Municipality notifies it. If it does not respond in time, the change is approved.
Is the site safe to restart?
Our engineers inspect it first and record the works and any temporary works in the technical report.
What if the old contractor will not release the permit?
You can still change contractor. Under Administrative Resolution No. 275 of 2024, the application goes in without the outgoing contractor’s signature, with the owner’s declaration, the reasons and the consultant’s technical report. Dubai Municipality gives the contractor up to 5 working days to respond. In a financial or contractual dispute it approves the change and gives up to 30 days to hand over the site.
Who can help me change my contractor in Dubai?
An engineering consultant prepares the technical report and submits the change. Structural Solutions handles contractor changes on Dubai Municipality permits, with or without the outgoing contractor’s agreement, and can take over as the replacement consultant if needed.
Can the new contractor start straight away?
No. The new contractor can start only after Dubai Municipality issues the new permit in its name.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
