Final Inspection Failed: Site Rectification for the Completion Certificate
The final inspection failed and you have a list of items. Here is how a rectification plan is prepared, carried out and re-inspected so the completion certificate (BCC) can be issued.
When the developer, the authority or Dubai Civil Defence fails the final inspection, they list the items to correct. We turn the list into a rectification plan: what to fix, how, who does it and in what order. The contractor corrects the works, we check them and update the drawings where needed, and the re-inspection is requested.
Typical items
Typical failed-inspection items
| Item | Typical fix |
|---|---|
| Works differ from drawings | Correct or approve as built |
| Safety items (balustrades, pool fence, stairs) | Correct on site to the required height and detail |
| Structural concerns | Our engineers inspect and design any repair |
| Fire safety items | DCD completion pending |
| Drainage and pool backwash | Pool backwash check |
| Finishing and damage | Contractor repairs |
Plan
What the rectification plan contains
| Part | Content |
|---|---|
| Item list | Each comment, with photo and location |
| Fix | Method and drawings where needed |
| Who | Contractor, specialist or us |
| Check | Our inspection before re-inspection |
| Re-inspection | Request and attendance |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence
What you need to know
- Every item counts: one open item fails the re-inspection.
- Check first: we inspect before booking.
- Drawings: updated where the works changed.
- New contractor if the old one is gone.
Documents you will need
- Inspection result and snag list
- Approved drawings
- Photos of each item
- Contractor details
How it works
How rectification works
1. List
Each failed item.
2. Plan
Fix and who.
3. Fix
Contractor.
4. Check
Our engineers.
5. Re-inspection
Developer, authority, DCD.
Already done
Failed because of unapproved works?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Failed inspection questions
My final inspection failed. What do I do?
Get the full list of items, prepare a rectification plan, correct the works and request re-inspection.
Do you carry out the corrections?
No. The contractor carries them out; we plan, check and close the file.
What if my contractor will not come back?
A new contractor can do the corrections. See contractor change on a DM permit.
How do I book the re-inspection?
We request it once the items are closed. See booking the inspection.
Villa sign-off failed. Is this the same?
Yes. See villa failed the sign-off inspection. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
How much does it cost?
It depends on the drawings and the scope. We review the file and advise.
Who can help?
Structural Solutions takes over stuck completion files. We audit the file, survey the works, prepare the as-built drawings and the owner letter pack, coordinate any contractor change and follow the developer and authority inspections until the completion certificate (BCC) is issued. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.