Not sure why your completion certificate (BCC) is not moving? Our completion file audit tells you exactly what is missing, what must be fixed and who needs to do what.

The completion file audit is the first step for any stuck file. We collect the permit, NOC, drawings, comments and photos, check the status with the authority and developer, inspect the site and give you a clear list: what is missing, what must be corrected, whether a contractor or consultant change is needed, and the steps to the certificate.

OutputMissing-items list
IncludesSite inspection
NextPlan to the BCC

Checklist

What the audit checks

ItemWhat we look for
PermitStatus, validity, contractor and consultant on file
Developer NOCValidity, conditions and inspection items
Approved drawingsAvailable, complete and matching the permit
As-built drawingsExist and match the site
SiteDifferences, snags and safety items
ReportsStructural, test and fire safety records
CommentsEvery open authority and developer comment
Owner documentsOwner letter, title deed and ID

Outcome

What you get

ResultMeaning
Ready to submitWe prepare the pack and book the inspection
Drawings neededas-built drawings for the completion certificate
Site fixes neededSite rectification plan
Contractor or consultant changecontractor change on a DM permit
Full takeovercompletion certificate takeover service

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • First step for any stuck file.
  • Clear list: what is missing and who fixes it.
  • Site visit included.
  • No guesswork: based on the actual comments.

Documents you will need

  • Permit number
  • Any drawings and NOCs
  • All comments received
  • Photos of the works
  • Title deed and owner ID

How it works

How the audit works

1. Collect

All papers.

2. Status

Authority and developer.

3. Inspect

Site visit.

4. Report

Missing items.

5. Plan

Steps to the BCC.

Questions

Audit questions

What is a completion file audit?

A review of your permit, drawings, comments and site that lists exactly what is missing before the completion certificate.

Do I need an audit if I know the problem?

It is still useful: files often have more than one open item.

What happens after the audit?

We prepare the missing items or take over the file. See completion certificate takeover service.

Can you audit a file from another consultant?

Yes. See taking over from another consultant.

Is this for the BCC too?

Yes. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.

How much does it cost?

It depends on the drawings and the scope. We review the file and advise.

Who can help?

Structural Solutions takes over stuck completion files. We audit the file, survey the works, prepare the as-built drawings and the owner letter pack, coordinate any contractor change and follow the developer and authority inspections until the completion certificate (BCC) is issued. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.