Dubai Municipality · Contractor change

Contractor Change on a Dubai Municipality Permit

Changing the contractor on a Dubai Municipality permit is a formal application under Administrative Resolution No. 275 of 2024.

Structural Solutions is a Dubai engineering consultancy. We prepare the technical report and the application, and submit the contractor change for you, with or without the outgoing contractor’s agreement. The application includes the owner’s declaration and the consultant’s technical report on the works done. Dubai Municipality then issues a new permit in the new contractor’s name, and the new contractor starts only after that.

RuleAdministrative Resolution No. 275 of 2024
AuthorityDubai Municipality
Submitted byYour consultant

What we check

  • Site record: Stage of the works
  • Drawings: Built vs approved
  • Permit: Current contractor and consultant
  • Agreement: Does the contractor agree?
  • New contractor: Licence, classification, insurance
  • Developer: Informed where there is one

Documents you will need

  • Building permit number and approved drawings
  • Owner ID and title deed
  • New contractor’s trade licence and insurance policy
  • Reasons for the change, if the contractor does not agree

Dubai law

What Dubai law says about changing a contractor

Contractor and consultant changes on a Dubai Municipality building permit follow Administrative Resolution No. 275 of 2024, issued by Dubai Municipality on 6 August 2024.

With the contractor’s agreement

One application is signed by the engineering consultant, the outgoing contractor and the new contractor. It includes the owner’s declaration and a technical report from the consultant on the stage of the works and whether they match the permit and the approved drawings. The new contractor endorses the report.

Without the contractor’s agreement

The application is signed by the consultant and the new contractor. It includes the owner’s declaration, a clear statement of the reasons for the change, and the consultant’s technical report. Dubai Municipality asks the outgoing contractor to respond within a time limit of no more than 5 working days.

If it is a money or contract dispute

If the dispute is financial or contractual, or the outgoing contractor does not respond in time, Dubai Municipality approves the change and gives the outgoing contractor up to 30 days to hand over the site. The new permit is then issued in the new contractor’s name. If the dispute is technical, Dubai Municipality reviews the case and approves or rejects the change.

What the new contractor needs

The new contractor must be licensed, with a classification not lower than the building’s, and must submit the insurance policy required by law. It cannot start work until the new permit is issued in its name.

Changing consultant and contractor together

If both the consultant and the contractor are changed without their agreement, the new consultant prepares the technical report, and the new contractor’s permit is issued once the consultant change is complete.

Who can apply

The owner can also apply for the change. In practice the consultant prepares the technical report and the application.

Our role: as your consultant, we inspect the site, record the works done against the approved drawings, prepare the technical report and the owner’s declaration, and submit the change. If your current consultant is not cooperating, we can take over as the replacement consultant and prepare the report ourselves.

Route

The Dubai Municipality contractor change route

With or without the outgoing contractor’s agreement.

StepApproval routeGuides
Site record
Our engineers
Technical report: stage of the works and whether they match the permit and the approved drawings.—
Owner declaration
Owner
Approves the change and appoints the new contractor.—
Application
Consultant and new contractor
The outgoing contractor signs too if it agrees; if not, the reasons are stated.Contractor not releasing the permit
Response
Outgoing contractor
Without agreement: up to 5 working days to respond.Contractor disputes
New permit
Dubai Municipality
Issued in the new contractor’s name, after the fees and its insurance policy.—
Works resume
New contractor
Only after the new permit, to the approved drawings.Continuing construction

How it works

How we handle it

1. Send us the details

Permit number, area and what happened.

2. Site visit

Our engineers record the works done.

3. Technical report

Stage of the works vs the approved drawings.

4. Application

With your declaration, and the reasons if needed.

5. Submission

By us, with follow-up on comments.

6. New permit

In the new contractor’s name.

What causes problems

  • New contractor on site before the new permit
  • No technical report on the works done
  • Reasons for the change not stated

Need help with this?

Get your contractor change moving

Send us three things on WhatsApp:

  1. Your building permit number and area
  2. What happened with the current contractor or consultant
  3. Photos of the site and any approved drawings

Our engineers inspect the site, prepare the technical report and submit the change for you.

Questions

Questions

Can the new contractor start straight away?

No. The new contractor can start only after Dubai Municipality issues the new permit in its name.

What if the old contractor will not release the permit?

You can still change contractor. Under Administrative Resolution No. 275 of 2024, the application goes in without the outgoing contractor’s signature, with the owner’s declaration, the reasons and the consultant’s technical report. Dubai Municipality gives the contractor up to 5 working days to respond. In a financial or contractual dispute it approves the change and gives up to 30 days to hand over the site.

Who can help me change my contractor in Dubai?

An engineering consultant prepares the technical report and submits the change. Structural Solutions handles contractor changes on Dubai Municipality permits, with or without the outgoing contractor’s agreement, and can take over as the replacement consultant if needed.

What does the new contractor need?

A Dubai licence with a classification not lower than the building’s, and the insurance policy required by law. It endorses the consultant’s technical report.

What if the dispute is about the quality of the work?

If the dispute is technical, Dubai Municipality reviews the case itself and approves or rejects the change. A clear technical report on the works done matters most here.

Do you check the works done?

Yes. The technical report records the stage of the works and whether they match the permit and the approved drawings.