Completion certificate · Stuck file · Updated November 2026

My Contractor Can’t Get the Completion Certificate (BCC): What to Do

The works are finished, but your contractor says the completion certificate (BCC) cannot be issued. Here is why it happens and how we take over the file, fix what is missing and close the permit.

When a contractor cannot get the completion certificate, the cause is almost always in the file or on site: missing or rejected as-built drawings, works that differ from the approved drawings, an expired permit or contractor licence, a failed inspection, missing test reports or a dispute. The owner can bring in an engineering consultant to audit the file and close it. On Dubai Municipality permits, Resolution 275 of 2024 also lets the owner and consultant apply without the contractor’s consent. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.

Common causeFile or site issue
Owner canAppoint a consultant
ResultBCC issued, permit closed

Diagnose

What the contractor’s answer usually means

Ask the contractor for the exact comment or reason, then match it here.

What the contractor saysWhat is usually behind itGuide
“The authority rejected the drawings”As-built drawings missing, wrong or not matching the siteas-built drawings for the completion certificate
“The inspector found issues”Snags or works that differ from the approved drawingsWorks don’t match the drawings
“The permit expired”The permit needs renewing before the completion requestPermit expired before completion
“My licence is being renewed”The contractor’s trade licence or registration lapsedContractor licence expired
“Civil Defence has not approved”Fire safety completion pendingDCD completion pending
“They want test reports”Concrete or load test reports missingStructural test reports
“The developer will not clear it”Developer snags or NOC conditions openDeveloper clearance
No clear answer, or no replyThe file may never have been submitted, or there is a disputecompletion certificate takeover service

Dubai law

Completion certificate without the contractor on DM permits

Administrative Resolution No. 275 of 2024, Articles 10 to 12, for Dubai Municipality permits.

SituationWhat the resolution says
Contractor does not agreeThe owner and the consultant can apply without the contractor’s consent, with a technical report from the consultant.
Contractor responseDubai Municipality gives the contractor 7 working days to give reasons.
No reply, or a financial or contractual reasonDubai Municipality proceeds with the completion certificate.
Technical or engineering reasonDubai Municipality checks the issues and decides case by case.
Consultant also refusesThe owner can apply; Dubai Municipality may ask for a technical report from an approved engineering consultancy.

DDA, Trakhees and other areas follow their own rules. We confirm the route for your case.

Options

Your options as the owner

OptionWhen it fits
Let the contractor finish with our supportThe contractor is cooperative but the file needs engineering work
Take over the completion fileThe contractor is slow, absent or unable; see completion certificate takeover service
Change the contractor on the permitUnfinished works need a new contractor; see contractor change on a DM permit
Apply without the contractor’s consent (DM)Works are finished and the contractor refuses; see contractor refused to sign off

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Ask for the exact reason: the authority comment tells you what is missing.
  • Owner letter: you sign it, not the contractor; see owner letter.
  • Dispute is separate: payment issues do not have to block the certificate on DM permits.
  • Unfinished works may need a new contractor first.

Documents you will need

  • Permit number and approved drawings
  • Any rejection or inspection comments
  • Photos of the finished works
  • Title deed and owner ID
  • Contractor contact and contract, if available

How it works

How we close the file when the contractor cannot

1. Get the reason

Comment or rejection.

2. File audit

What is missing.

3. Survey

Works against drawings.

4. Fix

Drawings, site, contractor.

5. Inspections

Developer and authority.

6. BCC

Permit closed.

Already done

Changes made on site without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Contractor and completion certificate questions

Why can’t my contractor get the completion certificate?

Usually because something in the file or on site does not match what the authority approved: as-built drawings, changes on site, an expired permit or licence, failed inspections or missing test reports.

My contractor is unable to obtain the BCC. What should I do?

Ask for the exact authority comment, then have a consultant audit the file. We find what is missing and close it with you. See completion certificate takeover service.

Can I get the completion certificate without my contractor?

Yes, in most cases. On DM permits, Resolution 275 of 2024 allows the owner and consultant to apply without the contractor’s consent. See completion certificate without the original contractor.

Does a payment dispute stop the completion certificate?

On DM permits, if the contractor’s reason is financial or contractual, Dubai Municipality proceeds with the certificate. In other areas we confirm the route.

Who signs the completion letter?

The owner signs the owner letter. A contractor completion letter is not what is required.

Do I need a new contractor?

Only if works are unfinished or must be corrected. Then the contractor on the permit is changed first.

Is the completion certificate the same as the BCC?

Yes. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.

How much does it cost?

It depends on the drawings and the scope. We review the file and advise.

Who can help?

Structural Solutions takes over stuck completion files. We audit the file, survey the works, prepare the as-built drawings and the owner letter pack, coordinate any contractor change and follow the developer and authority inspections until the completion certificate (BCC) is issued. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.