Shared Housing · Al Satwa

Shared housing approval in Al Satwa, Dubai

Al Satwa shared housing is allowed only in designated parts under the Dubai Municipality circular, with the permit, 5 m² per person and DCD approval.

The short answer

Al Satwa is allowed only in designated parts, so each plot must be checked. Under the DM circular (reported by Khaleej Times on 8 October 2026), shared housing in Al Satwa is allowed only in designated parts of the area, so we check your plot first. Properties on Al Wasl Road and Sheikh Zayed Road are family housing only. Each unit is individual or family housing, bedrooms need at least 5 m² per person, and the kitchen, bathroom, dining, recreation and laundry facilities are required, with Civil Defence approval and the shared accommodation permit. Existing shared properties must regularise by 8 September 2027.

StatusPartly allowed
Room size5 m² per person
Deadline8 September 2027

Al Satwa shared housing: what you need to know

  • Area status: Only designated parts of Al Satwa are allowed.
  • Category: Individual or family, one per unit.
  • Approvals: DCD approval and the DM permit.
  • Tenants: Apply with the owner NOC.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about Al Satwa shared housing

Is shared housing allowed in Al Satwa?

Only in designated parts; we check your plot.

Can a tenant apply?

Yes, with the owner NOC.

Do I need DCD approval?

Yes.

What are the fines?

AED 500 to AED 500,000 under the circular.

Related guides

Keep reading