Concrete Restoration and Strengthening Stamp for Trakhees
Repair or strengthening of concrete in a Trakhees area such as Palm Jumeirah, Jumeirah Park, The Gardens or JAFZA. Trakhees CED asks for a specialist stamp. Here is how it works.
Trakhees CED asks for a concrete restoration and/or strengthening specialist stamp on concrete repair and strengthening works, in addition to the consultant design. In Nakheel communities the Nakheel NOC comes first. Structural Solutions assesses the structure, prepares the repair or strengthening design, coordinates the specialist stamp and follows the file until the final approval. We do not hold the specialist stamp ourselves.
Where
Typical Trakhees works
| Location | Typical works |
|---|---|
| Palm Jumeirah villas and towers | Balcony and slab repair, column strengthening |
| Jumeirah Park and Jumeirah Islands | Villa structural repair and strengthening for extensions |
| The Gardens and Discovery Gardens | Building repair and spalling |
| JAFZA warehouses | Slab repair under racking, column strengthening; see warehouse strengthening |
Steel too
Steel works in Trakhees areas
| Question | Guide |
|---|---|
| Steel calculations for Trakhees | who can stamp steel calculations for Trakhees |
| Approved steel contractor | approved steel contractor |
| Trakhees approvals | Trakhees approvals |
Official sites: Trakhees
What you need to know
- Trakhees CED approves.
- Specialist stamp for restoration or strengthening.
- Nakheel NOC first in Nakheel areas.
- We coordinate until final approval.
Documents you will need
- Existing structural drawings
- Photos of the damage
- Nakheel or landlord NOC
- Test reports, if any
How it works
How we handle restoration for Trakhees
1. Assess
Survey and tests.
2. Design
Repair or strengthening.
3. NOC
Nakheel or landlord.
4. Stamp
Specialist coordinated.
5. Trakhees
Submission.
6. Final approval
We follow it.
Already done
Repairs already done without approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Trakhees concrete restoration: questions
Does Trakhees ask for a concrete restoration specialist stamp?
Yes. Trakhees CED asks for a concrete restoration and/or strengthening specialist stamp.
Who approves strengthening on Palm Jumeirah?
Nakheel gives the NOC, then Trakhees CED approves.
Does Structural Solutions hold the stamp?
No. We design the works and coordinate the specialist stamp.
Do you carry out the repair?
No. A specialist contractor carries out the works; we assess, design and supervise.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions designs concrete repair and strengthening for Trakhees CED, coordinates the specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
