Steel Specialist for Dubai Municipality Projects

Steel works on a Dubai Municipality (DM) building permit need a steel specialist as well as the consultant calculations. Structural Solutions prepares the calculations and drawings, coordinates the steel specialist with your main contractor and follows the file until the final approval.

For steel works on a Dubai Municipality (DM) permit, the main contractor appoints a specialist steel contractor or subcontractor as the steel specialist, who stamps the steel. The consultant prepares and stamps the structural calculations and drawings. Structural Solutions does the consultant side, coordinates the steel specialist stamp and follows the file through review and inspections until the final approval.

Steel specialistAppointed by the main contractor
ConsultantCalculations and drawings
WeCoordinate until final approval

Which works

DM steel works that usually need a steel specialist

WorksGuide
Steel mezzaninesteel mezzanine calculations by authority
Steel canopy, shade or pergolaPergola structural calculations
Steel staircaseExternal steel staircase
Steel frame villa extensionSteel frame villa extension
Warehouse or shed in Al Quoz, Al Qusais or Ras Al KhorAl Quoz steel structure calculations
Steel roof structureSteel roof structure

Process

How the steel specialist fits into the DM permit

StepWhat happens
1. DesignWe prepare the steel calculations and drawings; see steel connection design
2. AppointmentThe main contractor appoints the steel specialist contractor or subcontractor
3. StampWe coordinate the steel specialist stamp on the steel drawings
4. SubmissionWe submit to Dubai Municipality and answer the comments
5. SiteShop drawings checked against our design; inspections
6. Final approvalWe follow the file until the final approval

Questions

Questions owners ask about the DM steel specialist

Official sites: Dubai Municipality

What you need to know

  • Main contractor appoints the steel specialist.
  • Two stamps: consultant calculations and the steel specialist.
  • We coordinate until the final approval.
  • Fabrication and installation by the steel contractor.

Documents you will need

  • Title deed or tenancy contract with landlord NOC
  • Concept or architectural drawings
  • Main contractor details
  • Site photos

How it works

How we handle steel specialist works for DM

1. Brief

Works and location.

2. Design

Calculations and drawings.

3. Specialist

Appointed by the main contractor.

4. Stamp

Coordinated by us.

5. DM

Submission and comments.

6. Final approval

We follow it through.

Already done

Steel already built without a DM permit?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

DM steel specialist questions

Why does Dubai Municipality ask for a steel specialist?

Steel works need a specialist steel contractor to stamp the steel, in addition to the consultant calculations.

Who appoints the steel specialist on a DM permit?

The main contractor, as a specialist steel contractor or subcontractor.

Does Structural Solutions hold the steel specialist stamp?

No. We prepare the calculations and drawings and coordinate the steel specialist stamp as your consultant.

Can you follow the file until approval?

Yes. We follow it through review and inspections until the final approval.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions prepares the steel calculations, coordinates the steel specialist stamp and follows Dubai Municipality steel permits until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.