Tower Concrete Restoration for Owners Associations (DDA)
Owners associations and building managers in DDA areas plan concrete restoration across car parks, podiums, balconies and facades. We survey the building, prioritise the repairs, design them and take them through DDA with the specialist stamp.
A tower restoration starts with a condition survey and laboratory tests, then a repair plan by priority, then the repair designs with the concrete restoration stamp and the DDA submission. We supervise the specialist contractor so the works match the approved design.
Scope
What a tower restoration covers
| Area | Guide |
|---|---|
| Car parks | Car park slab repair |
| Podiums | Podium slab repair |
| Balconies | Balcony slab repair |
| Columns and beams | Column restoration |
| Whole building | Building condition survey |
For the board
What the owners association gets
| Item | Use |
|---|---|
| Condition report | What is wrong and where |
| Priority list | Safety first, then durability |
| Repair designs and stamp | For DDA and for contractor quotes |
| Supervision reports | Works match the design |
Official sites: DDA | Dubai Building Code
What you need to know
- Survey first: the plan follows the findings.
- Priorities help plan the budget.
- Contractor quotes on one design.
- Supervision to close-out.
Documents you will need
- Building details and as-built drawings
- Earlier reports
- Known problem areas
- Building management rules
How it works
How we run a tower restoration
1. Survey
Whole building.
2. Tests
Laboratory.
3. Plan
By priority.
4. Designs
Stamped.
5. DDA
Submission.
6. Works
Supervised.
Questions
Owners association questions
Can the repairs be done in phases?
Yes. The priority list lets the owners association plan phases.
Can contractors quote on your design?
Yes. One design lets you compare quotes fairly.
Do you carry out the works?
No. We assess, design and supervise; a specialist contractor carries out the works.
Who can help?
Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
