Billboards · Method · Updated November 2026

How to Calculate Wind Load on a Billboard

Wind load on a billboard is worked out from the design wind pressure at the board height, the area of the board and a force coefficient for its shape, as per the Dubai Building Code. That force then flows down through the frame, the connections, the base plate and the foundation or roof, and every part is checked.

In short: find the design wind pressure for the site and height, multiply by the exposed area and the force coefficient for a flat board, then place that force at the centre of the board. The result gives the shear and the overturning moment that the pole, the anchors and the foundation must resist.

PressureFrom the Dubai Building Code for the site and height
Area x coefficientSize and shape of the board
MomentForce times height to the base

The method

Step by step

General method. Values are taken from the Dubai Building Code for each site; we do not publish set figures.

StepWhat is worked out
1. Design wind speedTaken from the Dubai Building Code for the location
2. Height and terrainWind is stronger higher up and in open ground
3. Wind pressureFrom the wind speed, height and terrain
4. Force on the boardPressure x board area x force coefficient
5. Load casesWind straight on and at an angle, which twists the board
6. Down to the baseShear and overturning moment at the pole base

What is checked

Where the force goes

PartCheck
Board frameBending of the members between supports
Pole or legsBending, buckling and deflection
ConnectionsBolts and welds; see connection design
Base plate and anchorsAnchor bolt tension; see base plates
Foundation or roofOverturning, sliding and bearing; see foundations

Official sites: Dubai Municipality | RTA | Dubai Building Code

What you need to know

  • Dubai Building Code: the design basis for the authority submission.
  • Height matters: wind pressure rises with height.
  • Angled wind twists the board, not only pushes it.
  • Stamped: the authority needs calculations stamped by the engineer.

Documents you will need

  • Sign or billboard drawings (size, height, materials)
  • Location and photos
  • Supplier data for LED screens or panels
  • Landlord or building owner consent where needed

How it works

How we prepare billboard wind load calculations

1. Drawings

Board size, height, frame.

2. Site

Location and exposure.

3. Wind load

As per the Dubai Building Code.

4. Structure

Frame to foundation.

5. Stamp

Calculations stamped.

6. Submit

With the permit file.

Questions

Questions owners ask

How do you calculate wind load on a billboard?

Design wind pressure for the site and height, times the board area, times a force coefficient. The force is then followed down to the foundation.

Which code is used in Dubai?

The Dubai Building Code. See which code applies.

Is the wind load the same for every billboard?

No. It changes with the height, the size, the shape and the site.

Can I use a generic wind calculator?

Not for the authority submission. It needs calculations stamped by the engineer.

Who can help?

Our engineers prepare the wind load and structural calculations, stamp them for the authority submission and support the approvals. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading