Can I Merge Two Units Across a Corridor?

The units face each other, not side by side. The corridor between them belongs to the building.

Rarely, and only with the building's agreement. The corridor is a common area that belongs to the building, not to the unit owners, and it is usually part of the escape routes. Taking or closing it needs the developer or building management to agree, and Civil Defence to accept the escape routes. Connecting units through a door may be easier. We check the options.

RarelyBuilding must agree
CorridorCommon area
Key issueEscape routes

What decides it

  • Ownership: Building or developer
  • Escape routes: For other units
  • Alternatives: Separate units, one tenant
  • DCD: Exits for everyone

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Owner or landlord, and building management
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
The authority for the area
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

Related guides

What stops a merge

  • Corridor needed for escape
  • Building refusing
  • Closing a common area without approval

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Can I buy the corridor?

That is for the building or developer to decide.

Is there an alternative?

Often running both units separately under one business.

Do you check it?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.