JAFZA · Shop merging

JAFZA Unit Merging Approval

Planning to merge two units or warehouses in JAFZA? Here is the route.

JAFZA

In JAFZA, the landlord approves the merge first, then the works are approved by Trakhees CED, submitted by the consultant, with Civil Defence for fire safety. The wall between the units is checked by a structural engineer and Civil Defence approves the merged layout. We confirm the route for your building and handle the approvals up to completion.

NOCLandlord (JAFZA or the owner)
AuthorityTrakhees CED
ThenCivil Defence

What decides it in JAFZA

  • Building: Its rules for merging
  • Wall: Load-bearing or not
  • Exits: For the merged unit
  • Shopfronts: One or two
  • Utilities: DEWA meters and load

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Landlord (JAFZA or the owner)
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
Trakhees CED
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

What stops a merge

  • Building management refusing
  • A load-bearing wall
  • Works started before approval

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Who approves merging two units in JAFZA?

The landlord first, then Trakhees CED, then Civil Defence.

Can two warehouses be merged?

Possibly. The wall, the structure and fire separation decide. We check it.

How long does shop merging take?

It depends on the building, the area, the structure and the approvals involved. We review your case and tell you.