Shop Merging Approval in Dubai

Two shops side by side can become one bigger store, restaurant or showroom. Here is the full route, by area, from the first NOC to completion.

Merging two shops

Merging two shops is usually possible in Dubai, but it needs the owner or landlord and building management NOC first, a structural check of the wall between the units, the authority approval for the area, and Civil Defence for the new fire layout. The authority depends on where the building is: Dubai Municipality in areas such as Downtown, Al Barsha, Deira and Karama, DDA in areas such as Business Bay, Dubai Marina, JBR, DIFC and City Walk, Trakhees in JVC and JAFZA, DMCC in JLT and the DSO Authority in Dubai Silicon Oasis. In malls, the mall management approves first. We confirm the route for your building and handle the approvals up to completion.

FirstOwner and building NOC
ThenStructure, authority, DCD
AuthorityDepends on the area

What a shop merge involves

  • Party wall: Removed or opened
  • Shopfronts: One or two entrances
  • Fire safety: Exits and systems for the new size
  • MEP: AC, power, DEWA meters
  • Signage: One sign across both fronts
  • Title deeds: Updated at DLD if the owner wants

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Owner or landlord, and building management
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
DM, DDA or the area authority
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Shop merging: questions

Can any two shops be merged?

Usually adjacent shops can, but the building, the wall and the approvals decide. We check your units.

Who approves shop merging?

The owner or landlord and the building management first, then the authority for the area, then Civil Defence.

Do I need a structural engineer?

Yes, to check the wall between the units.

How long does shop merging take?

It depends on the building, the area, the structure and the approvals involved. We review your case and tell you.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.