City Walk Shop Merging Approval
Planning to merge two shops or units in City Walk? Here is the route for the area.
City Walk
In City Walk, Meraas and the building approve the merge first, then the works are approved by DDA. The wall between the units is checked by a structural engineer and Civil Defence approves the merged layout. We confirm the route for your building and handle the approvals up to completion.

Official sources: Dubai Municipality · DDA · Dubai Civil Defence · DEWA · Dubai Land Department
What decides it in City Walk
- Building: Its rules for merging
- Wall: Load-bearing or not
- Exits: For the merged unit
- Shopfronts: One or two
- Utilities: DEWA meters and load
Documents you will need
- Title deeds, or the tenancy contracts with the owner's written NOC
- Unit numbers and building name
- Existing drawings of both units, if available
- Photos of the wall between the units
Route
The shop merging route
The general route. We confirm it for your building and area.
| Step | Approval route | Guides |
|---|---|---|
| NOC Meraas and building | Approval of the merge by the owner or landlord and the building management or developer. | Combination NOC |
| Structural check Consultant | We check the wall between the units and design the opening. | Party wall assessment |
| Authority approval DDA | We submit the merging drawings as your consultant. | — |
| Civil Defence (DCD) DCD | Fire and life safety for the merged layout: exits, alarms, sprinklers. | DCD for merged shops |
| Utilities DEWA | Meters and load for the merged unit, where needed. | DEWA meters |
| Completion Authority and DCD | Inspection and completion. The title deeds can then be updated at DLD where the owner wants it. | Title deed |
How it works
How we take your merge to completion
1. Send us the details
Area, building, both unit numbers and photos.
2. We confirm the route
NOC, authority and DCD for your building.
3. Structural check
The wall between the units.
4. Drawings
Merged layout, structure, fire safety, MEP.
5. Approvals
We submit and follow up.
6. Works and completion
By your contractor, then inspection.
Related guides
- shop-merging-approval-dubai
- Can I merge two shops in Dubai?
What stops a merge
- Building management refusing
- A load-bearing wall
- Works started before approval
Merging two units?
Get your route confirmed
Send us three things on WhatsApp:
- The area, building and both unit numbers
- Photos of the wall between the units
- Shop, office or restaurant
We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.
Questions
Questions
Who approves shop merging in City Walk?
Meraas and the building first, then DDA, then Civil Defence.
Are City Walk shopfronts controlled?
Yes, frontage changes are reviewed by Meraas. We include them in the drawings.
How long does shop merging take?
It depends on the building, the area, the structure and the approvals involved. We review your case and tell you.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
