Who Issues the Al Aryam NOC?
Al Aryam issues the NOC directly. We get in touch with its engineering team and obtain the NOC for you. We are an independent consultancy, not part of Al Aryam.
The Al Aryam NOC is issued directly by Al Aryam, and its engineering team reviews the application. We get in touch with that team on your behalf and obtain the NOC. We are an independent engineering consultancy and not part of Al Aryam. DDA does not issue this NOC: it comes in afterwards, for major works.
Mira Oasis
Mira and Mira Oasis guides
Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.
What you need to know
- Before DDA: The NOC comes first.
- Same for both: Mira and Mira Oasis follow the same route.
- Not us: We work for the owner, and Al Aryam makes the decision.
- PMO: The PMO gate pass is separate from the NOC.
Documents you will need
- Scope of works
- Proposed drawings
- Owner documents
- Other documents, if the reviewing team asks for them
How it works
How it works
1. Scope
You tell us what you want to change.
2. Drawings
We obtain the as-built drawings from the master developer, or on your behalf, and prepare the proposed drawings.
3. Al Aryam NOC
We get in touch with the Al Aryam engineering team and obtain the NOC.
4. DDA
Major works, including partition changes, go to DDA. For very minor works, we review and advise.
5. Gate pass
Your contractor gets the gate pass to work on site.
Who does what
Who is involved
Al Aryam
Its engineering team reviews the application and issues the NOC directly.
Al Aryam NOC guide →Dubai Development Authority (DDA)
Issues the permit for major works, after the Al Aryam NOC.
Is Al Aryam under DDA? →Structural Solutions
An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.
Al Aryam NOC guide →What we handle
- Al Aryam NOC
- Mira and Mira Oasis modifications
- PMO gate pass
What can hold up an application
- Scope of works not clear
- Proposed drawings incomplete
- Owner documents missing
- The reviewing team asks for more documents
Questions
Questions owners ask
Who issues the Al Aryam NOC?
Al Aryam, directly.
Does DDA issue it?
No. DDA issues the permit for major works, after the NOC.
Are you Al Aryam?
No, we are an independent consultancy.
Can you deal with Al Aryam for me?
Yes, we get in touch with the engineering team and obtain the NOC.