Shared Housing · Al Barsha 1

Shared housing approval in Al Barsha 1, Dubai

Al Barsha 1 shared housing is fully allowed under the Dubai Municipality circular, with the permit, 5 m² per person and DCD approval.

The short answer

Al Barsha 1 has villas and apartment buildings next to Sheikh Zayed Road. Under the DM circular (reported by Khaleej Times on 8 October 2026), shared housing in Al Barsha 1 is allowed in all parts of the area. Properties on Sheikh Zayed Road itself are family housing only. Each unit is individual or family housing, bedrooms need at least 5 m² per person, and the kitchen, bathroom, dining, recreation and laundry facilities are required, with Civil Defence approval and the shared accommodation permit. Existing shared properties must regularise by 8 September 2027.

StatusFully allowed
Room size5 m² per person
Deadline8 September 2027

Al Barsha 1 shared housing: what you need to know

  • Area status: All parts of Al Barsha 1 are allowed.
  • Category: Individual or family, one per unit.
  • Approvals: DCD approval and the DM permit.
  • Tenants: Cannot sublet rooms; a licensed operator applies with the owner's consent.

What to send us

  • Title deed (owner), or trade licence with the owner's written consent (licensed operator)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner consent (operators)
Owner
A licensed operator applies with the owner's written consent. Individual tenants cannot sublet rooms.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about Al Barsha 1 shared housing

Is shared housing allowed in Al Barsha 1?

Yes, in all parts of the area.

Can a tenant apply?

Not as an individual tenant: residents cannot sublet rooms. A licensed operator can apply with the owner's written consent.

Do I need DCD approval?

Yes.

What are the fines?

AED 500 to AED 500,000, and up to AED 1 million for repeat violations.

Related guides

Keep reading