Can I rent rooms in my villa separately in Dubai?
To rent rooms in my villa separately, the villa must be permitted shared accommodation in an allowed area, with the DM permit and DCD approval.
The short answer
Renting rooms separately to different people is shared housing under the DM rules (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026). The villa must be in an allowed area, used as individual or family housing (family only on the four main roads), with bedrooms of 5 m² per person and the required facilities, DCD approval and the permit. We prepare the drawings and handle the approvals.

Official sources: Dubai Municipality · Dubai Civil Defence · Khaleej Times report on the DM circular
Rent rooms in my villa separately: what you need to know
- Allowed areas only: 28 fully and 11 partly allowed areas.
- 5 m² per person: Minimum bedroom area.
- One category: Individual or family, not mixed.
- DCD and DM: Both approvals are required.
What to send us
- Title deed (owner), or tenancy contract with owner NOC (tenant)
- Emirates ID or passport
- Affection plan or site plan
- Existing drawings, if available; we can survey
- Photos of the rooms and facilities
- Trade licence, if a company owns or operates the property
Who does what
From check to permit
The order of the DCD and DM steps can vary; we confirm it for your property.
| Step | Approval route | Guides |
|---|---|---|
| Check the area and category You and us | Confirm the property is in an allowed area, and choose individual or family housing. | Allowed areas |
| Owner NOC (tenants) Owner | A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed. | Tenants |
| Survey and layout drawings Structural Solutions | Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry. | Layout drawings |
| Structural check Structural Solutions | Partitions and any added loads are checked by our engineers. | — |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval for the shared accommodation. | DCD approval |
| Shared accommodation permit Structural Solutions → Dubai Municipality | The permit to operate the property as shared accommodation. | The permit |
How it works
How it works
1. Check
Area, category and occupancy for your property.
2. Drawings
Survey and layout drawings to the DM rules.
3. Approvals
DCD approval and the DM shared accommodation permit.
4. Operate
Rent the property as permitted shared accommodation.
Questions
More questions about rent rooms in my villa separately
Can I rent the annex separately?
It is part of the shared housing review.
Is my villa area allowed?
Check the list or send us the plot.
Do I need DCD?
Yes.
Can the tenant do it?
With the owner NOC.
Related guides
