العربيةShared Housing · Questions

Is bed-space rental allowed in Dubai?

Bed-space rental is allowed only as permitted shared accommodation, in an allowed area, with 5 m² per person, DCD approval and the DM permit.

The short answer

Bed-space rental is shared housing, so the DM rules apply (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026): the property must be in an allowed area, set as individual housing (not on the four family-only roads), with at least 5 m² per person, the required facilities, DCD approval and the permit. Without these it is a violation, with fines from AED 500 to AED 500,000. Existing bed-space properties must regularise by 8 September 2027.

Allowed areas28 fully, 11 partly
Room size5 m² per person
Deadline8 September 2027

Bed-space rental: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about bed-space rental

Is bed-space rental legal in Karama?

Karama is allowed, with the permit and approvals.

Is it allowed in JLT?

JLT is not on the list.

How many beds per room?

Room area divided by 5.

Can a tenant run it?

With the owner NOC and the permit.

Related guides

Keep reading