Shared Housing · Questions

How many people can live in a 2-bedroom apartment in Dubai?

In a 2-bedroom apartment used as shared housing, add both bedrooms at 5 m² per person: two 12 m² bedrooms hold four people.

The short answer

Each bedroom in shared housing needs at least 5 m² per person under the DM rules (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026). In a 2-bedroom apartment with a 15 m² and a 12 m² bedroom, that is three plus two, five people. The apartment also needs the required facilities, must be in an allowed area, and needs DCD approval and the DM permit.

Rule5 m² per person
Two 12 m² rooms4 people
15 + 12 m²5 people

2-bedroom apartment: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or trade licence with the owner's written consent (licensed operator)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner consent (operators)
Owner
A licensed operator applies with the owner's written consent. Individual tenants cannot sublet rooms.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about 2-bedroom apartment

Can I add a third room?

Only within an approved layout.

Does a maid room count?

We check it against the 5 m² rule and the layout.

Who measures?

We survey the apartment.

Can a tenant rent out rooms?

No. Residents cannot sublet; only owners or licensed operators may let rooms.

Related guides

Keep reading