Shared Housing · Questions

Is shared housing allowed in Dubai Marina, JLT or Downtown?

No. Shared housing in Dubai Marina, JLT or Downtown is not allowed: these areas are not on the Dubai Municipality list.

The short answer

The DM circular (reported by Khaleej Times on 8 October 2026) allows shared housing only in 39 listed areas, mostly in Deira, Bur Dubai, Karama, Al Qusais, Al Nahda, Jumeirah 1, Al Barsha 1 and Al Warqa 1. Dubai Marina, Jumeirah Lakes Towers (JLT) and Downtown Dubai are not on the list, so apartments there cannot be used as shared accommodation. Renting the apartment as a single unit is not affected.

Allowed areas28 fully, 11 partly
Room size5 m² per person
Deadline8 September 2027

Shared housing in Dubai Marina: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or trade licence with the owner's written consent (licensed operator)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner consent (operators)
Owner
A licensed operator applies with the owner's written consent. Individual tenants cannot sublet rooms.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about shared housing in Dubai Marina

Is Business Bay allowed?

Business Bay is not on the list.

Is JVC allowed?

JVC is not on the list.

Which areas are allowed?

See the full list of 39 areas.

Can I rent to one family?

Yes, a single-unit rental is not shared housing.

Related guides

Keep reading