Shared Housing · Questions

Can I turn my apartment into shared housing in Dubai?

You can turn your apartment into shared housing if the building is in an allowed area, with bedrooms of 5 m² per person, the facilities, DCD approval and the DM permit.

The short answer

An apartment can be used as shared housing only if the building is in one of the allowed areas (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026). It must be set up as either individual or family housing, with bedrooms of at least 5 m² per person and a kitchen, bathroom, dining, recreation and laundry facilities. Civil Defence (DCD) approval and the DM shared accommodation permit are required. The owner applies, or a tenant with the owner NOC; the owner NOC is enough.

Allowed areas28 fully, 11 partly
Room size5 m² per person
Deadline8 September 2027

Turn my apartment into shared housing: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about turn my apartment into shared housing

Is Dubai Marina allowed?

No, it is not on the list.

Can a tenant do it?

Yes, with the owner NOC.

Do I need building management approval?

The owner NOC is enough.

How many people can live in it?

Bedroom area divided by 5.

Related guides

Keep reading