Is my area allowed for shared housing in Dubai?
To check if your area is allowed for shared housing, use the Dubai Municipality list: 28 areas fully allowed, 11 partly. Other areas are not allowed.
The short answer
The DM circular (reported by Khaleej Times on 8 October 2026) lists 28 areas where shared housing is fully allowed, such as Karama, Oud Metha, Al Barsha 1, Jumeirah 1, Al Qusais and Al Nahda, and 11 where it is allowed only in designated parts, such as Al Satwa, Mankhool and Al Mamzar. If your area is partly allowed, we check your plot. If it is not on the list, shared housing is not allowed there.

Official sources: Dubai Municipality · Dubai Civil Defence · Khaleej Times report on the DM circular
Area allowed for shared housing: what you need to know
- Allowed areas only: 28 fully and 11 partly allowed areas.
- 5 m² per person: Minimum bedroom area.
- One category: Individual or family, not mixed.
- DCD and DM: Both approvals are required.
What to send us
- Title deed (owner), or trade licence with the owner's written consent (licensed operator)
- Emirates ID or passport
- Affection plan or site plan
- Existing drawings, if available; we can survey
- Photos of the rooms and facilities
- Trade licence, if a company owns or operates the property
Who does what
From check to permit
The order of the DCD and DM steps can vary; we confirm it for your property.
| Step | Approval route | Guides |
|---|---|---|
| Check the area and category You and us | Confirm the property is in an allowed area, and choose individual or family housing. | Allowed areas |
| Owner consent (operators) Owner | A licensed operator applies with the owner's written consent. Individual tenants cannot sublet rooms. | Tenants |
| Survey and layout drawings Structural Solutions | Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry. | Layout drawings |
| Structural check Structural Solutions | Partitions and any added loads are checked by our engineers. | — |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval for the shared accommodation. | DCD approval |
| Shared accommodation permit Structural Solutions → Dubai Municipality | The permit to operate the property as shared accommodation. | The permit |
How it works
How it works
1. Check
Area, category and occupancy for your property.
2. Drawings
Survey and layout drawings to the DM rules.
3. Approvals
DCD approval and the DM shared accommodation permit.
4. Operate
Rent the property as permitted shared accommodation.
Questions
More questions about area allowed for shared housing
Is Al Barsha 1 allowed?
Yes, fully allowed.
Is Al Satwa allowed?
Only in designated parts.
Is JLT allowed?
JLT is not on the list.
How do you check my plot?
Send us the plot number or affection plan.
Related guides
