DIEZ Approval in Dubai Silicon Oasis: Fit-Out and Building Permits
In Dubai Silicon Oasis, fit-out and building permits come from the DSO Authority, part of DIEZ (Dubai Integrated Economic Zones Authority). Here is the full route, from the building NOC to completion.
DIEZ is the Dubai Integrated Economic Zones Authority. In Dubai Silicon Oasis (DSO), its DSO Authority issues the fit-out and building permits, so a DSO permit is a DIEZ permit. The route is: building management or landlord NOC, then the DSO Authority (DIEZ) permit, then Dubai Civil Defence approval, then inspection and completion. There is no developer NOC in DSO. Restaurants also need the kitchen layout approved by Dubai Municipality Food Safety, and clinics need Dubai Health Authority (DHA) approval. An approved consultant submits, and contractors can submit too.
What you need to know
- DIEZ and DSO: The DSO Authority is part of DIEZ; the DSO permit is a DIEZ permit.
- Not DM or DDA: Works in Dubai Silicon Oasis are permitted by the DSO Authority.
- Civil Defence: Every fit-out change that affects fire safety goes to DCD.
- Restaurants: DM Food Safety for the kitchen; LPG through the approved gas provider, or an undertaking letter for electric cooking.
- Clinics: DHA approval on top.
- Who submits: An approved consultant; contractors can submit too.
Documents you will need
- Lease or title deed, and trade licence for businesses
- Building management or landlord NOC
- Existing or as-built drawings of the unit
- Proposed fit-out or modification drawings, stamped by the consultant
- Fire safety drawings for Civil Defence
- Structural calculations where the works need them
By type of unit
DIEZ approvals by type of unit
We confirm the route for your unit.
| Unit | Approval route | Guides |
|---|---|---|
| Office Building NOC, DSO Authority, DCD | Layout and fire safety. | DSO fit-out |
| Shop or showroom Building NOC, DSO Authority, DCD | Layout and signage. | Shops |
| Restaurant or café Plus DM Food Safety | Kitchen layout; LPG provider approval or electric undertaking. | Restaurants |
| Clinic Plus DHA | Health facility approval. | Clinics |
| Warehouse Building NOC, DSO Authority, DCD | Mezzanine and racking checked. | Mezzanine and racking |
| Villa (Cedre Villas) Through an approved consultant | To the DSO Authority. | DSO building permit |
How it works
How we get your DIEZ permit
1. Review
The unit, the works and the drawings you have.
2. Building NOC
From building management or the landlord.
3. Drawings
Fit-out or modification drawings, and calculations if needed.
4. DSO Authority (DIEZ)
Fit-out or building permit.
5. Civil Defence
Fire safety approval.
6. Inspection
Inspection and completion.
Who does what
Who approves works in Dubai Silicon Oasis
Building management or landlord
Their NOC comes first. There is no developer NOC in Dubai Silicon Oasis.
Building NOC →DSO Authority (DIEZ)
The Dubai Silicon Oasis Authority, part of DIEZ, issues the fit-out and building permits.
What is DIEZ? →Structural Solutions
As the consultant, prepares the drawings and calculations and submits to the DSO Authority.
DSO approval services →Why DIEZ submissions get returned
- Building management or landlord NOC missing
- Drawings that do not match the unit
- Fire safety changes without DCD approval
- Structural changes without calculations
- Works started before the permit
Questions
Questions owners and tenants ask
What is DIEZ?
The Dubai Integrated Economic Zones Authority; in Dubai Silicon Oasis its DSO Authority issues the permits.
Is a DSO permit a DIEZ permit?
Yes.
Do I need a developer NOC in DSO?
No, the building management or landlord NOC comes first.
Do I need Civil Defence approval as well?
Yes, for fire safety.
Who can submit to the DSO Authority?
An approved consultant; contractors can submit too.
Related guides
