Dubai Silicon Oasis · Structural Calculations

Do I need structural calculations for a DSO fit-out?

When the fit-out adds loads, openings, a mezzanine, racking or heavy equipment, yes.

Yes, when the fit-out in Dubai Silicon Oasis adds loads or changes the structure, for example a mezzanine, racking, heavy equipment, a new slab opening, a server room or a steel structure. The calculations check the slab, beams and connections and are stamped for the DSO Authority submission; steel works also need specialist verification and a stamp. Structural Solutions prepares the calculations.

Needed forLoads, openings, mezzanines
ChecksSlab, beams, connections
SteelSpecialist stamp

What you need to know

  • Mezzanines: Need stamped calculations.
  • Equipment: Floor load checks.
  • Openings: New slab openings need design.
  • Steel: Specialist verification and stamp.

Documents you may need

  • Trade licence and tenancy contract (Ejari)
  • Building management or landlord NOC
  • Unit plan and existing drawings
  • Fit-out drawings: architectural, MEP and fire safety
  • Photos of the unit

Who does what

Step by step

We confirm the route for your unit.

StepApproval routeGuides
Building or landlord NOC
Building management or landlord
Approval of the works in the building or unit.Building management NOC
Drawings and calculations
Structural Solutions
Architectural, MEP, fire safety drawings and stamped calculations where needed.Which drawings?
DSO Authority permit
Consultant or contractor → DSOA (DIEZ)
The fit-out or building permit for the works.DSO fit-out approval
DCD approval
Structural Solutions → DCD
Fire and life safety approval for every commercial fit-out change.DSO and DCD
Inspection and completion
DSO Authority and DCD
Final inspections and the completion certificate.Completion

Questions

Related questions

Does a simple office fit-out need calculations?

Not if nothing structural changes.

Does a server room need a check?

Heavy equipment may need a floor check.

Who stamps them?

Our engineers.

Do steel works need more?

Specialist verification and a stamp.