Dubai Silicon Oasis · Authority

Who Approves Works in Dubai Silicon Oasis: DM, DDA or the DSO Authority?

The DSO Authority, part of DIEZ, approves building and fit-out works in Dubai Silicon Oasis. Not Dubai Municipality or DDA, and there is no developer NOC.

Dubai Silicon Oasis is under the DSO Authority, which is part of DIEZ (Dubai Integrated Economic Zones Authority). It issues the fit-out and building permits in DSO, not Dubai Municipality or DDA. There is no developer NOC: the building management or landlord NOC comes first, then the DSO Authority permit, then Civil Defence for every commercial fit-out change. Submissions are made by an approved consultant, and contractors can submit too; villa works in Cedre Villas go through an approved consultant.

AuthorityDSO Authority (DIEZ)
NotDM or DDA
Developer NOCNone

What you need to know

  • DSO Authority: Fit-out and building permits.
  • DIEZ: The authority the DSO Authority belongs to.
  • Building NOC: First step for units.
  • Civil Defence: Every commercial fit-out change.
  • Cedre Villas: Through an approved consultant.

Documents you will need

  • Lease or title deed, and trade licence for businesses
  • Building management or landlord NOC
  • Existing or as-built drawings of the unit
  • Proposed fit-out drawings, stamped by the consultant
  • Fire safety drawings for Civil Defence
  • Structural calculations where loads or openings change

By type of unit

Who approves what in DSO

We confirm the route for your unit.

WorkApproval routeGuides
Office or shop fit-out
DSO Authority, DCD
After the building NOC.Fit-outs
Restaurant
Plus DM Food Safety
Kitchen layout.Restaurants
Clinic
Plus DHA
Health facility.Clinics
New building or major works
DSO Authority building permit
Structural design.Building permit
Villa (Cedre Villas)
DSO Authority
Approved consultant.Cedre Villas

How it works

How we get your DSO approval

1. Review

The unit, the planned works and the drawings you have.

2. Drawings

Existing drawings, or we survey and redraw the unit.

3. Building NOC

From building management or the landlord.

4. DSO Authority

Fit-out or building permit, part of DIEZ.

5. Civil Defence

Fire safety drawings approved.

6. Works

Carried out to the approved drawings.

7. Completion

Inspection and completion before the unit opens.

Who does what

Who approves it in Dubai Silicon Oasis

🏢

Building management or landlord

Issues the NOC for the works in your unit. There is no developer NOC in DSO.

Building NOC →
🏛️

DSO Authority (DIEZ)

Issues the fit-out or building permit for works in Dubai Silicon Oasis.

DIEZ approval →
🚒

Dubai Civil Defence

Approves the fire safety for every commercial fit-out change and inspects before completion.

DSO and DCD →
📐

Structural Solutions

Prepares the drawings and calculations and handles the submissions as consultant.

Talk to our engineers →

What we prepare

Why DSO submissions get returned

  • Building management or landlord NOC missing
  • Drawings that do not match the unit on site
  • Fire safety changes not shown for Civil Defence
  • Structural changes without stamped calculations
  • Works started before the permit

Questions

Questions tenants and owners ask

Who approves works in Dubai Silicon Oasis?

The DSO Authority, part of DIEZ.

Is DSO under Dubai Municipality?

No, the DSO Authority issues the permits.

Is DSO under DDA?

No.

Is there a developer NOC in DSO?

No, the building or landlord NOC comes first.

Who submits?

An approved consultant, and contractors can submit too.

Related guides