Murooj Al Furjan · Nakheel · Villa

Can I Change My Boundary Wall or Gate in Murooj Al Furjan?

Can I Change My Boundary Wall or Gate in Murooj Al Furjan? Changes need a Nakheel NOC, and Nakheel reviews the height, design and effect on neighbours and the street.

Boundary walls and gates are part of the community’s look, so any change, such as raising, rebuilding or replacing a gate, needs a Nakheel NOC. Nakheel reviews the design against the community and the neighbours. New or raised walls need stamped structural calculations.

Developer NOCNakheel NOC
AuthorityTrakhees
PlansNakheel provides villa plans
boundary wall or gate in Murooj Al Furjan

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing area: measured from the Nakheel villa plans and on site.
  • Unapproved works: older changes that would show in the Nakheel VSR are approved first.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in Murooj Al Furjan
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Nakheel villa plans, if you have them

Who does what

The approval route in Murooj Al Furjan

Nakheel first, then Trakhees. Murooj Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides.—
Nakheel NOC
Nakheel
NOC. Nakheel reviews the design and confirms its fees.Nakheel extension fees
Permit
Trakhees
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Nakheel and Trakhees
Inspections during and after the works.—
Completion
Trakhees
Completion certificate that closes the permit; Nakheel updates its records.—

How it works

How it works in Murooj Al Furjan

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Nakheel villa plans, a site check, drawings and stamped calculations where needed.

We get it approved

Nakheel NOC, then the Trakhees permit where the works are structural.

What each work needs in Murooj Al Furjan

  • Extension: Nakheel NOC, Trakhees permit and stamped calculations
  • Wall removal: structural check, Nakheel NOC and Trakhees permit
  • Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
  • Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
  • External colour or façade: Nakheel NOC
  • Internal finishes only: usually no permit; check with Nakheel first

Questions

Questions owners ask in Murooj Al Furjan

Can I raise my boundary wall?

Nakheel reviews any change to wall height and design. It needs a Nakheel NOC and stamped calculations for the wall and foundation.

Can I replace my gate?

A new gate changes the street view, so it needs a Nakheel NOC with the design and materials.

Do I need my neighbour’s agreement?

Shared boundary walls affect the neighbour, and Nakheel can ask for their consent. We include it when needed.

Can I attach a pergola or shade to the boundary wall?

Boundary walls are often not designed for extra load. Shades are usually freestanding or fixed to the villa.

What if the wall was changed without approval?

It needs a retrospective approval with drawings, or must be restored.

Last checked: October 2026. Official sources: Nakheel · Trakhees · Dubai Municipality

Related guides

Keep reading