Harmony Tilal Al Ghaf NOC: villa changes in Harmony I, II and III
Harmony Tilal Al Ghaf NOC: villa changes in Harmony I, II and III need the Majid Al Futtaim (MAF) NOC, then a DDA building permit for structural or external works. All three phases follow the same rules. We prepare the drawings and handle both.
Harmony is the villa area of Tilal Al Ghaf, the Majid Al Futtaim master community, in three phases: Harmony I, II and III. The rules are the same in all three. Every home improvement needs the MAF NOC first, and major works then need a DDA permit. The MAF Home Improvement Guidelines set the limits: extensions only if the outside look stays the same, no garage conversion, partial rear balcony enclosure only, pergolas open and no higher than 2.8 m, and pools at least 1.20 m from the boundary wall. A pool also needs the Dubai Municipality environmental NOC. The cost depends on the works, so we review your idea and advise.

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality (pool environmental NOC)
Harmony Tilal Al Ghaf NOC: what needs approval
- Extensions: Same outside look only
- Garden suites: Separate annex in the garden
- Solar panels: Roof only, DEWA NOC first
- Swimming pools: 1.20 m from the boundary wall
- Pergolas and gazebos: Open, max 2.8 m, 80 cm from the wall
- Balcony: Partial rear enclosure only
Documents you will need
- Title deed and owner ID
- Villa type, phase and photos
- Plans from your handover documents (or we survey)
- Drawings and calculations (we prepare these)
- Owner letter for sign-off
Harmony and nearby
Harmony Tilal Al Ghaf NOC by phase
The same approval route everywhere in Tilal Al Ghaf: MAF NOC, then DDA.
| Area | Approval route | Guides |
|---|---|---|
| Harmony I MAF NOC → DDA permit | Same rules as Harmony II and III. | Garden suite |
| Harmony II MAF NOC → DDA permit | Same rules as Harmony I and III. | Extensions |
| Harmony III MAF NOC → DDA permit | Same rules as Harmony I and II. | Pools |
| Harmony Bungalows MAF NOC → DDA permit | Single-level homes. | Harmony Bungalows |
How it works
How we get your Harmony works approved
1. Review
Your idea, photos and plans.
2. Check
Villa type, plot and guidelines.
3. Drawings
Drawings and calculations.
4. MAF NOC
We apply for you.
5. DDA permit
Building permit for the works.
6. Sign-off
Inspection, completion, deposit back.
What Harmony owners ask us about
Common reasons for MAF or DDA comments
- Works outside the MAF Home Improvement Guidelines
- Structures closer than 80 cm to the boundary wall
- Drawings that do not match the villa
- Works started before the NOC
Planning works in Harmony?
Send your idea. We check what is possible.
Send us three things on WhatsApp:
- What you want to change
- Photos of the villa
- Plans from your handover documents, if you have them
We tell you what is possible for your villa type, the approvals needed and the cost for your scope.
Questions
Harmony Tilal Al Ghaf NOC questions
Who approves villa changes in Harmony, Tilal Al Ghaf?
Two approvals. First the Majid Al Futtaim (MAF) NOC, then a DDA building permit for structural and external works. We prepare the drawings and handle both.
What are Harmony I, Harmony II and Harmony III?
The three phases of Harmony, the villa area of Tilal Al Ghaf. Harmony I, II and III follow the same rules and the same approval route.
Is Harmony under Dubai Municipality or DDA?
DDA. Harmony is approved by the Dubai Development Authority after the MAF NOC. The only Dubai Municipality step is the environmental NOC for a swimming pool.
How do I apply for the MAF NOC for my Harmony villa?
We prepare the drawings and apply for the MAF NOC for you.
Can I extend my Harmony villa?
Yes, if the outside look of the villa stays the same. The extension must match the existing design, materials and colours and must not block the neighbour's view; changing the look or the façade is not permitted. It adds GFA and needs the MAF NOC and a DDA permit.
Can I add a garden suite to my Harmony villa?
Garden suites are possible for most Tilal Al Ghaf villas, but not all. A garden suite counts as added GFA and needs the MAF NOC, then a DDA permit.
Can I build a room on the roof of my Harmony villa?
Only if it keeps the same outside look of the villa. A roof room is visible from the street, so MAF checks the elevations closely. It adds GFA and needs a structural check of the roof, the MAF NOC and a DDA permit. We check your villa before design.
Can I close my balcony in Harmony?
Partially, and only the rear balcony. Full enclosure of balconies is not permitted. A partial enclosure is allowed where there is a concrete slab above and it does not block the neighbour's view.
Can I convert the garage or carport into a room?
No. The MAF guidelines do not permit converting the carport into storage or living space. You can add a lightweight cover that is not visible from the street, sits below the carport parapet and matches the louvre colour.
Can I build a pool, pergola or gazebo in Harmony?
Yes, with approval. Pergolas and gazebos must be open, no higher than 2.8 m and at least 80 cm from the boundary wall; gazebos go in the back garden only. A pool must be at least 1.20 m from the boundary wall, with a safety fence and the deck no more than 30 cm above ground, plus the Dubai Municipality environmental NOC for the backwash.
When can contractors work in Harmony?
Between 9am and 5pm, not on weekends or public holidays. A copy of the MAF NOC must be posted on the front door or wall, and the contractor needs a contractor access permit from MAF.
Where do I get the plans of my Harmony villa?
Use the plans from your handover documents. If you do not have them, we survey the villa and prepare as-built drawings.
Which works in Harmony do not need a permit?
Like-for-like maintenance and internal finishes that do not change the layout, structure or outside of the villa usually do not need a DDA permit. Ask us before starting: external changes always need the MAF NOC.
The previous owner changed my Harmony villa. Is it approved?
Check the approved drawings and the NOC for those works. If there are none, they need to be regularised before sale or new works.
What happens if I start works in Harmony without the NOC?
The works can be stopped, and you may have to regularise or remove them. Unapproved works also cause problems when you sell.
How do I get sign-off for my Harmony works?
Book the inspection once the site is cleared. For major works, MAF refunds the security deposit after you submit the DDA building permit, the approved drawings and the completion certificate. We prepare and obtain these.
How much does a Harmony NOC and permit cost?
It depends on the works and the scope: an extension is not a pergola. Send us your idea, photos and any drawings you have, and we review them and advise.
What do you need from me to start?
Your title deed, the villa type and phase, photos, any drawings you have and a short description of the changes. We confirm what is possible and the approvals.
Related guides
Keep reading
From our guides
