JLT Apartment Renovation NOC: What You Can Change and How to Get Approval

Renovating an apartment in JLT needs the building or owners association NOC and DMCC approval through Concordia. Kitchens, walls and layouts can often change, with drawings.

Apartment renovations in JLT need the building management or owners association NOC, then DMCC approval reviewed through Concordia. Moving a kitchen, changing the layout or removing a wall is possible in many cases, with drawings and, for walls, a structural check. Changes that affect fire safety go to Civil Defence. Facade and balcony changes affect the building and are checked with building management first.

FirstBuilding or OA NOC
ApprovalDMCC through Concordia
WallsStructural check

What you need to know

  • Kitchen: Can often move; drainage and ventilation are shown on the drawings.
  • Layout: New partitions and room changes need drawings.
  • Walls: Checked first; some walls carry the building.
  • Bathrooms: Waterproofing and drainage.
  • Facade and balcony: Checked with building management first.

Documents you will need

  • Lease or title deed, and trade licence for businesses
  • Building management or owners association NOC
  • Existing or as-built drawings of the unit
  • Proposed fit-out drawings, stamped by the consultant
  • Fire safety drawings for Civil Defence
  • Contractor registration with Concordia

By type of unit

Common apartment changes

We confirm the route for your unit.

ChangeApproval routeGuides
Move the kitchen
Drawings with drainage and ventilation
Building NOC and DMCC via Concordia.—
Remove a wall
Structural check
Stamped calculations if allowed.Wall removal
Merge two apartments
Structural check and approvals
Openings between units.Merging apartments
Facade or balcony
Checked with building management first
Affects the building.Facade
Core drilling
Structural check
Slab openings.Core drilling

How it works

How we get your JLT approval

1. Review

The unit, the changes and the drawings you have.

2. Drawings

Existing drawings from building management or DMCC, or we survey and redraw.

3. Building NOC

From building management or the owners association.

4. DMCC and Concordia

Fit-out approval, reviewed through Concordia.

5. Civil Defence

Fire safety drawings approved.

6. Works

By a contractor registered with Concordia.

7. COC

Concordia inspection and Certificate of Completion.

Who does what

Who approves it in JLT

🏢

Building management

The building management or owners association NOC comes first.

Building NOC first →
🏛️

DMCC through Concordia

DMCC approves the fit-out; Concordia reviews the drawings, inspects the works and issues the COC.

Concordia and DMCC →
🚒

Dubai Civil Defence

Approves the fire safety drawings for the fit-out.

DCD in JLT →
📐

Structural Solutions

Prepares the drawings and calculations and handles the submissions.

Talk to our engineers →

What we prepare

Why JLT submissions get returned

  • Drawings that do not match the unit
  • Building management NOC missing
  • Fire safety changes without DCD approval
  • Contractor not registered with Concordia
  • Works started before approval

Questions

Questions tenants and owners ask

Do I need a NOC to renovate my JLT apartment?

Yes, from building management or the owners association, then DMCC via Concordia.

What can I change in my JLT apartment?

Layouts, kitchens and bathrooms are often possible with drawings; walls need a structural check.

Can I move my kitchen in JLT?

Often yes, with drawings showing drainage and ventilation.

Can I close my balcony?

It changes the facade, so check with building management first.