DDA Steel Design Review and Approval
A steel design from a fabricator, a supplier or another engineer needs checking before it goes to DDA. We review the members and connections, revise where needed, coordinate the steel specialist stamp and submit.
We review steel designs by others against the loads, the codes and the existing structure they connect to, then coordinate the approved steel contractor (also called a steel specialist) stamp and submit to DDA. DDA may also ask for third-party verification.
What we check
What the steel review covers
| Check | Why |
|---|---|
| Loads and members | Sizes match the loads |
| Connections | Steel connection design |
| Base plates and anchors | Base plate and anchor design |
| Support structure | Existing slab, beam or wall can carry it |
| Shop drawings | Shop drawing approval |
Official sites: DDA | Dubai Building Code
What you need to know
- Steel specialist stamp needed on steel works.
- We coordinate the stamp; we do not fabricate.
- Existing structure checked too.
- Third-party verification if DDA asks.
Documents you will need
- Steel drawings
- Calculations
- Location and photos
- Fabricator details
How it works
How the steel review works
1. Send
Drawings and calcs.
2. Review
Mark-ups.
3. Revise
Agreed changes.
4. Stamp
Steel specialist.
5. Submit
DDA.
Questions
Steel review questions
Can you review a fabricator's steel design for DDA?
Yes. We review it, revise what is needed and coordinate the stamp.
Who stamps the steel?
An approved steel contractor (also called a steel specialist). See steel specialist stamp for DDA.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.