What Does a Steel Specialist Do on a Dubai Municipality Permit?
Your Dubai Municipality (DM) permit lists a steel specialist and you want to know what that party actually does, and why DM asks for one. Here is the split of roles, and where Structural Solutions fits.
On a Dubai Municipality (DM) permit, the steel specialist is the specialist steel contractor or subcontractor, appointed by the main contractor, that stamps the steel drawings and fabricates and installs the steel. DM asks for one so the steel works are carried out by a specialist in steel. The design side is separate: Structural Solutions, as consultant, prepares and stamps the structural calculations, coordinates the steel specialist stamp and follows the file until the final approval.
Role
What the steel specialist is responsible for
| Task | Who does it |
|---|---|
| Structural calculations and design drawings | Consultant (Structural Solutions) |
| Steel specialist stamp on the steel drawings | Steel specialist |
| Shop drawings and fabrication | Steel specialist |
| Shop drawing check against the design | Consultant; see steel shop drawing approval |
| Erection on site | Steel specialist |
| Submission, comments and follow-up | Consultant, until the final approval |
Why
Why Dubai Municipality asks for a steel specialist
| Reason | What it means for you |
|---|---|
| Steel is fabricated off site | A specialist controls the steel quality, welds and bolts |
| Connections carry the load | Connections are built as designed; see steel connection design |
| One responsible steel party | DM knows who stamps and builds the steel |
Official sites: Dubai Municipality
What you need to know
- The steel specialist builds and stamps the steel.
- The consultant designs and follows the file.
- Main contractor appoints the steel specialist.
- We coordinate the two sides.
Documents you will need
- DM permit details
- Steel drawings or concept
- Main contractor details
- Steel specialist details, if known
How it works
How the steel specialist fits into the work
1. Design
Our calculations.
2. Specialist
Appointed by the main contractor.
3. Stamp
Coordinated by us.
4. Shop drawings
Checked by us.
5. Site
Erection and inspection.
6. Final approval
We follow it.
Questions
Steel specialist role: questions
What does a steel specialist do on a DM permit?
Stamps the steel drawings and fabricates and installs the steel. The consultant designs the structure.
Why does Dubai Municipality ask for a steel specialist?
So the steel works are carried out and stamped by a specialist in steel, in addition to the consultant design.
Does the steel specialist prepare the calculations?
No. The consultant prepares and stamps the structural calculations. Our engineers do this.
Who appoints the steel specialist?
The main contractor. See who can be the steel specialist on a DM project.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions prepares the steel calculations, coordinates the steel specialist stamp and follows Dubai Municipality steel permits until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.