DDA · Question · Updated November 2026

What Does DDA Check in a Strengthening Submission?

A strengthening or repair submission to DDA goes through the Building Modification service. DDA lists the structural calculations and models, where applicable, among the requirements. Here is what a complete file includes.

A complete DDA strengthening file includes the developer or building NOC, the existing and proposed structural drawings, the structural calculations and models where applicable, the test results, the method statement and the strengthening specialist stamp. The contractor then needs the DDA No Objection for the structural works.

DDA listsCalculations and models
PlusSpecialist stamp
ThenNo Objection for works

Complete file

What goes in the file

ItemNotes
Developer or building NOCWhere the location needs one
Existing structureAs-built drawings or our survey
Strengthening or repair drawingsMethod, extent and details
Structural calculations and modelsWhere applicable, in DDA's words
Test resultsA testing laboratory carries out the tests; our engineers choose the tests and read the results.
Method statementPropping and sequence
Strengthening specialist stampstrengthening specialist stamp

Official sites: DDA | Dubai Building Code

What you need to know

  • Complete files get fewer comments.
  • Existing structure must be known first.
  • Stamp on the design.
  • Contractor needs the No Objection.

Documents you will need

  • Title deed or lease
  • NOC requirements
  • As-built drawings, if available
  • Any test results

How it works

How we prepare a complete file

1. Collect

Existing information.

2. Test

Laboratory.

3. Design

Drawings and calcs.

4. Stamp

Specialist.

5. Submit

Complete file.

Questions

DDA submission questions

What documents does DDA need for structural strengthening?

The NOC, drawings, calculations and models where applicable, test results, method statement and the specialist stamp.

Do I need testing before strengthening?

Usually yes, to know the concrete you are strengthening. A testing laboratory carries out the tests; our engineers choose the tests and read the results.

What if there are no as-built drawings?

We survey the structure and prepare them. See as-built drawings.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading