Villa As-Built Approval with Dubai Municipality
Many older villas in Dubai Municipality areas have rooms, a majlis, a roof room or a car shade added years ago with no approval and no completion certificate. Here is how we take those villas to an approved as-built file.
Villa as-built approval with Dubai Municipality is the route for works that are already built on a standalone villa plot. Built works do not follow the same route as new works. In areas such as Al Rashidiya, Mirdif, Jumeirah, Al Wasl and Al Barsha there is no developer NOC: the submission goes to Dubai Municipality through an approved consultant, and Structural Solutions submits it for you. We survey the villa, check the structure of the added works, prepare the as-built drawings, and tell you what your case needs before anything is submitted. The authority may apply a fine, depending on the case.
What we do
Our as-built service for Dubai Municipality villas
| Stage | What happens |
|---|---|
| 1. Review | Your title deed, affection plan, any old permit or drawings, photos |
| 2. Site survey | We measure the villa and every addition: as-built survey |
| 3. Structural check | We check the added works: structural report |
| 4. As-built drawings | Architectural and structural drawings of the villa as it stands |
| 5. Advice | What your case needs; works that cannot be approved: contact us for more details |
| 6. Submission | We submit to Dubai Municipality as approved consultant |
| 7. Completion | DM final inspection, then the completion certificate |
Common additions
Additions we see on older villas
These are the works owners most often ask us about. Each link explains that item.
| Addition | Guide |
|---|---|
| Old extension or extra rooms | Old villa extension as-built |
| Majlis or guest annex | Majlis and annex as-built |
| Extra floor or roof room | Floor addition sign-off |
| Servant or driver rooms | Service block |
| Car shade | Car shade built without approval |
| Boundary wall and gate | Boundary wall sign-off |
| Outdoor kitchen | Outdoor kitchen sign-off |
| Villa used commercially | Villa to commercial use |
Common problems
Problems that stop old villa files
| Problem | Guide |
|---|---|
| No approved drawings on file | Existing drawings or a new survey |
| Original consultant or contractor not available | Without the original contractor |
| Works do not match the permit | Works do not match |
| No building card in the DM system | Old plot, no building card |
| Permit never closed | Close a stuck permit |
| Selling the villa | Completion certificate to sell |
Areas
Dubai Municipality villa areas we cover
Standalone villa plots in these areas go to Dubai Municipality with no developer NOC. We handle as-built approval and the completion certificate in all of them.
| Area | Guide |
|---|---|
| Al Rashidiya | Al Rashidiya guide |
| Al Garhoud | Al Garhoud guide |
| Mirdif | Mirdif guide |
| Al Mizhar | Al Mizhar guide |
| Muhaisnah | Muhaisnah guide |
| Al Twar | Al Twar guide |
| Al Qusais | Al Qusais guide |
| Al Nahda | Al Nahda guide |
| Al Mamzar | Al Mamzar guide |
| Hor Al Anz | Hor Al Anz guide |
| Al Warqa | Al Warqa guide |
| Nad Al Hamar | Nad Al Hamar guide |
| Jumeirah 1, 2 and 3 | Jumeirah 1, 2 and 3 guide |
| Al Wasl | Al Wasl guide |
| Al Safa | Al Safa guide |
| Umm Suqeim | Umm Suqeim guide |
| Al Satwa | Al Satwa guide |
| Al Bada'a | Al Bada'a guide |
| Al Manara | Al Manara guide |
| Al Barsha | Al Barsha guide |
| Al Sufouh | Al Sufouh guide |
| Al Mankhool | Al Mankhool guide |
| Oud Metha | Oud Metha guide |
| Nad Al Sheba | Nad Al Sheba guide |
Official sites: Dubai Municipality | Dubai Building Code
What you need to know
- Built works follow their own route.
- No developer NOC on standalone plots.
- We submit to Dubai Municipality.
- A fine may apply, by case.
Documents you will need
- Title deed and owner ID
- Affection plan
- Any old permit, drawings or building card
- Photos of the added works
How it works
Our as-built route, in order
1. Send
Photos, plot.
2. Survey
The villa.
3. Check
Structure.
4. Draw
As-builts.
5. Submit
To DM.
6. Close
Completion.
Questions
Villa as-built approval: questions
How do I get an as-built approval for my villa in Dubai Municipality?
An approved consultant prepares the as-built drawings and submits them to Dubai Municipality. We survey the villa, check the structure, draw it as built and submit it for you.
Can Dubai Municipality approve an extension built without a permit?
It depends on the works and your plot. We survey and check them first, then tell you what your case needs. The authority may apply a fine, depending on the case. Contact us for more details.
What documents are needed for a DM as-built approval?
Title deed, owner ID, affection plan, any old permit or drawings, and photos. We prepare the drawings and the structural check.
Do I need a structural report for as-built approval?
We check the structure of the added works and include it in the file where your case needs it.
What happens if my villa has unapproved additions?
They can block new permits and the completion certificate, and cause problems when you sell. The authority may apply a fine, depending on the case.
Is there a developer NOC in these areas?
Not on standalone villa plots. You deal with Dubai Municipality, through us.
How much does a villa as-built approval cost?
Our fee depends on the drawings and the scope; we review and advise. Any Dubai Municipality fees, or a fine where one applies, are separate and depend on the case.