Dubai Municipality · Old extensions · Updated November 2026

Old Villa Extension As-Built Approval in Dubai

The extension went up ten or twenty years ago, sometimes before you bought the villa. Now a sale or a new permit has brought it back. This is where an old extension stands, and what we do with it.

An old villa extension as-built approval is how an extension built years ago, without approval or without a completion certificate, is brought into an approved file. In Dubai Municipality areas we start from what is on site, not from the old paperwork: we survey the extension, check its structure against the existing villa, prepare the as-built drawings and compare them with any old permit. Then we tell you what your case needs. Whether a given extension can be approved depends on the works and your plot rules; works that cannot be approved: contact us for more details. The authority may apply a fine, depending on the case.

Starts fromWhat is on site
Key checkStructure of the extension
ThenCompletion certificate

Typical cases

Old extensions we are asked about

CaseWhat we look at first
Extension built by a previous ownerTitle deed date, any permit on file, survey
Permit issued, never closedThe open permit and what was built: stuck permits
Built larger than the permitDifferences between the permit drawings and the site
No drawings at allSurvey and redraw
Extension on old foundationsStructural check of the connection and the load path

Structure

Why the structural check comes first

Old extensions are often tied into the original villa without design. Before any submission we check the slab, beams, columns and the joint with the original building, and we record it in the file.

ItemWhat we check
Connection to the villaHow the new slab and beams bear on the old structure
FoundationsSigns of settlement or cracking
Roof and slabSpans, cracks, water damage
TestingConcrete testing where needed

Next

Where this leads

Official sites: Dubai Municipality | Dubai Building Code

What you need to know

  • Old does not mean approved.
  • Site first, paperwork second.
  • Structure checked before submission.
  • We advise on your case.

Documents you will need

  • Title deed
  • Any old permit or drawings
  • Affection plan
  • Photos of the extension

How it works

How we handle an old extension

1. Records

What is on file.

2. Survey

The extension.

3. Structure

Checked.

4. Compare

With the permit.

5. Advise

Your case.

6. Submit

To DM.

Questions

Old extensions: questions

Can I get a completion certificate for a villa extension built years ago?

It depends on the works and your plot rules. We survey and check the extension, prepare the as-built drawings and tell you what your case needs. Contact us for more details.

The previous owner built the extension. Is it my problem now?

The file follows the villa, so it matters when you sell, extend again or apply for a permit. We start with a survey.

Do I need the original drawings?

They help, but we can survey and redraw the villa as it stands.

Will Dubai Municipality fine me?

The authority may apply a fine, depending on the case.

What if the extension cannot be approved?

Contact us for more details. We advise on your case.

How much does a villa as-built approval cost?

Our fee depends on the drawings and the scope; we review and advise. Any Dubai Municipality fees, or a fine where one applies, are separate and depend on the case.

Who can help?

Structural Solutions surveys, checks and files old villa extensions with Dubai Municipality. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.