Old Villa Extension As-Built Approval in Dubai
The extension went up ten or twenty years ago, sometimes before you bought the villa. Now a sale or a new permit has brought it back. This is where an old extension stands, and what we do with it.
An old villa extension as-built approval is how an extension built years ago, without approval or without a completion certificate, is brought into an approved file. In Dubai Municipality areas we start from what is on site, not from the old paperwork: we survey the extension, check its structure against the existing villa, prepare the as-built drawings and compare them with any old permit. Then we tell you what your case needs. Whether a given extension can be approved depends on the works and your plot rules; works that cannot be approved: contact us for more details. The authority may apply a fine, depending on the case.
Typical cases
Old extensions we are asked about
| Case | What we look at first |
|---|---|
| Extension built by a previous owner | Title deed date, any permit on file, survey |
| Permit issued, never closed | The open permit and what was built: stuck permits |
| Built larger than the permit | Differences between the permit drawings and the site |
| No drawings at all | Survey and redraw |
| Extension on old foundations | Structural check of the connection and the load path |
Structure
Why the structural check comes first
Old extensions are often tied into the original villa without design. Before any submission we check the slab, beams, columns and the joint with the original building, and we record it in the file.
| Item | What we check |
|---|---|
| Connection to the villa | How the new slab and beams bear on the old structure |
| Foundations | Signs of settlement or cracking |
| Roof and slab | Spans, cracks, water damage |
| Testing | Concrete testing where needed |
Next
Where this leads
| Topic | Guide |
|---|---|
| All villa additions | villa as-built approval with Dubai Municipality |
| Completion certificate | DM villa completion certificate |
| Majlis or annex | Majlis and annex as-built |
Official sites: Dubai Municipality | Dubai Building Code
What you need to know
- Old does not mean approved.
- Site first, paperwork second.
- Structure checked before submission.
- We advise on your case.
Documents you will need
- Title deed
- Any old permit or drawings
- Affection plan
- Photos of the extension
How it works
How we handle an old extension
1. Records
What is on file.
2. Survey
The extension.
3. Structure
Checked.
4. Compare
With the permit.
5. Advise
Your case.
6. Submit
To DM.
Questions
Old extensions: questions
Can I get a completion certificate for a villa extension built years ago?
It depends on the works and your plot rules. We survey and check the extension, prepare the as-built drawings and tell you what your case needs. Contact us for more details.
The previous owner built the extension. Is it my problem now?
The file follows the villa, so it matters when you sell, extend again or apply for a permit. We start with a survey.
Do I need the original drawings?
They help, but we can survey and redraw the villa as it stands.
Will Dubai Municipality fine me?
The authority may apply a fine, depending on the case.
What if the extension cannot be approved?
Contact us for more details. We advise on your case.
How much does a villa as-built approval cost?
Our fee depends on the drawings and the scope; we review and advise. Any Dubai Municipality fees, or a fine where one applies, are separate and depend on the case.