As-Built Drawings · Existing or Survey

Existing drawings or a new survey: which do I need in Dubai?

Existing drawings or new survey? If your property has not changed, the existing approved drawings are usually enough. If it was modified or nothing is on file, you need a survey and new as-built drawings.

The short answer

Start with the existing drawings. If the villa, apartment or office has not been changed since it was approved, the approved drawings held by the developer, building management or authority usually show it correctly, and we can obtain them with your authorisation letter. If walls, extensions or layouts were changed, or no drawings are on file, you need a measured survey and new as-built drawings that show the property as it is today. You can request existing drawings on the web app, and a survey on the website.

Unchanged propertyExisting drawings
Modified propertySurvey and new drawings
Nothing on fileSurvey and new drawings

Existing drawings or new survey: what you need to know

  • Existing drawings: Retrieved with your authorisation letter; PDF, and CAD where available.
  • New as-built drawings: Measured survey and drawings of the property as it is today.
  • For approvals: A modification or completion may need drawings that match the site.
  • Not sure?: Send photos; we tell you which you need.

Documents you may need

  • Title deed (owner) or tenancy contract with landlord NOC (tenant)
  • Owner Emirates ID or passport
  • Signed authorisation letter (company stamp if company-owned)
  • Trade licence, if the property is owned by a company
  • Seller NOC letter, if you are buying the property

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Send your request
You
On the web app or the website request form, with your property details and documents.Dubai Approvals web app
Request on the website
Authorisation letter
Owner
Signed by the owner. If the property is owned by a company, signed and stamped with the company stamp.Authorisation letter
We request the drawings
Structural Solutions
From the developer, building management or authority that holds them.Where drawings are kept
You receive the drawings
Structural Solutions
As PDF, and as CAD files where the developer releases them, for example Emaar and Nakheel.CAD files
If nothing is on file
Structural Solutions
We survey the property and prepare new as-built drawings.As-built survey

Questions

More questions about existing drawings or new survey

Can I start with existing drawings?

Yes. If they do not match the site, we can survey after.

Where do I request a survey?

On the website request form.

Do new as-built drawings need a stamp?

When submitted to an authority, a consultant stamp is usually needed.

Which is needed for selling?

Usually the existing approved drawings, unless changes were made.

Related guides

Keep reading