The Springs · Emaar · Villa

The Springs As-Built Drawings: Original Plans or Site Survey

The Springs as-built drawings: Emaar provides as-built plans to owners. Where plans are missing or out of date, we survey the villa and redraw them in PDF and CAD.

The short answer

As-built drawings show the villa as it is built: layouts, dimensions, structure and any changes. You need them for extensions, approvals, sales and fixing unapproved works. Emaar provides as-built plans to owners. Where they are missing, incomplete or don’t match the villa, we survey on site and prepare new as-built drawings in PDF and CAD.

Developer NOCEmaar Community Portal
AuthorityDubai Municipality
PlansEmaar provides as-built plans
The Springs as-built drawings

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing floor area: measured from the as-built plans, so the extension allowance is right.
  • Unapproved works: older changes are surveyed and approved before new works.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in The Springs
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Who does what

The approval route in The Springs

The Springs is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides.—
Emaar NOC
Emaar Community Management
NOC through the Emaar Community Portal. Emaar reviews the design and confirms its fees.Emaar extension fees
Permit
Dubai Municipality
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Emaar and Dubai Municipality
Inspections during and after the works; the order can vary.—
Completion
Dubai Municipality
Completion certificate that closes the permit; Emaar then closes its file.—

How it works

How it works in The Springs

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Emaar as-built plans, a site check, drawings and stamped calculations where needed.

We get it approved

Emaar NOC, then the Dubai Municipality permit where the works are structural.

What each work needs in The Springs

  • Extension: up to 10% per Emaar, Emaar NOC, Dubai Municipality permit and stamped calculations
  • Wall removal: structural check, Emaar NOC and Dubai Municipality permit
  • Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
  • Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
  • External colour or façade: Emaar NOC
  • Internal finishes only: usually no permit; check with Emaar first

Questions

Questions owners ask in The Springs

Where do I get the original plans?

Emaar provides as-built plans to owners.

What if the plans don’t match my villa?

We survey the villa and redraw the as-built drawings to match.

What formats do you provide?

PDF and CAD.

Why do I need as-built drawings?

For extension designs, approvals, a sale, and fixing earlier unapproved works.

Do you visit the villa?

Yes, for a survey where drawings are missing or out of date.

Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA

Related guides

Keep reading