Peer review · Structural design · Dubai

Structural Peer Review in Dubai: Independent Design Check

A second engineer checks the structural design before it is built.

A structural peer review is an independent check of a structural design by another engineer. Our engineers review the loads, the analysis model, the design of slabs, beams, columns and foundations, and the key details, then issue a clear report with comments by priority. We work for developers, owners, contractors and consultants on villas, buildings and industrial projects.

Structural Peer Review in Dubai: Independent Design Check

Official sources: Dubai Municipality

What we check

  • Design: Drawings and calculations
  • Loads: Dead, live, wind, seismic
  • Model: Analysis and inputs
  • Members: Slabs, beams, columns, foundations
  • Codes: Design codes used
  • Output: Review report and comments

Documents you will need

  • Structural drawings and calculations
  • The analysis model, if available
  • Soil investigation report
  • Architectural drawings and the project brief

Route

How it works, step by step

Who does what, from the first check to completion.

StepApproval routeGuides
Documents
You or the design team
Drawings, calculations, the analysis model and the soil report.—
Review
Our engineers
Loads, model, member design, foundations and details checked.—
Report
Structural Solutions
Comments listed by priority, with what needs to change.—
Response
The design team
Revises the design or answers each comment.—
Close-out
Our engineers
Revisions checked and the review closed.—

How it works

How we work

1. Send the design

Drawings, calculations, model.

2. Scope

Full review or specific elements.

3. Review

Loads, model, members, foundations.

4. Report

Clear comments by priority.

5. Revisions

The designer responds.

6. Close-out

We check and close.

What causes problems

  • Reviewing drawings without the calculations behind them
  • Wrong loads carried through the whole design
  • Comments left open at construction

Need a second check?

Send us the design

Send us three things on WhatsApp:

  1. Drawings and calculations
  2. The analysis model, if any
  3. What worries you about the design

Our engineers review the design and give you a clear report with what to change.

Questions

Questions

What does a peer review cover?

Loads, analysis, member design, foundations and key details.

Who asks for one?

Developers, owners, contractors and design teams, for a second check.

Do you redesign the structure?

We review and comment; where asked, we can propose changes.

Can you review only part of the design?

Yes, for example the foundations or a transfer slab.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading