Should I Prepare Drawings With and Without the Mezzanine?
If you have not decided yet, two options help you compare structure, GFA and layout before choosing what to submit.
The short answer
If you are unsure, we can prepare the design with and without the mezzanine so you can compare the added GFA, the structure and the layout, and sometimes the lift position. The developer and the authority approve the option you choose, so you submit one option for approval.
What you need to know
- GFA: The mezzanine adds floor area.
- Structure: Different supports for each option.
- Lift: Its position can change with the mezzanine.
Documents you will need
- Title deed and Emirates ID of the owner
- Approved or as-built drawings of the villa
- Mezzanine drawings with stamped structural calculations
- Developer or master community NOC
- Fire safety drawings for Civil Defence
By situation
Villa mezzanine route by community
We confirm the route for your building and area.
| Community | Approval route | Guides |
|---|---|---|
| Nakheel communities (Palm, Jumeirah Park, Jumeirah Islands, Al Furjan) Nakheel NOC, then Trakhees | Counts as GFA. | Trakhees villas |
| Jumeirah Golf Estates JGE NOC, then Trakhees | Counts as GFA. | JGE |
| Jebel Ali Village Nakheel NOC, then Trakhees | Counts as GFA. | Jebel Ali Village |
| Emaar communities such as Arabian Ranches and Dubai Hills Emaar NOC, then DDA | Counts as GFA. | — |
| Dubai Municipality areas Approved consultant submits to DM | Counts as GFA. | — |
How it works
How we get your mezzanine approved
1. Site and slab review
The unit, the existing slab and columns, and what the mezzanine is for.
2. Existing drawings
From the landlord, developer or authority; if missing or out of date, we survey and draw as built.
3. Design and calculations
Mezzanine drawings, steel design and stamped structural calculations, with the added floor area shown.
4. NOC
Landlord, building management or master developer NOC.
5. Permit and Civil Defence
The authority for the area approves the structure; the approved steel contractor stamps the steel; DCD approves fire safety.
6. Build, inspect, complete
The mezzanine is built as approved, inspected, and the completion certificate is issued.
Who does what
Who approves a villa mezzanine
Master developer
Gives the NOC for the villa, through its portal or community team.
Authority for the community
Dubai Municipality, DDA or Trakhees issues the building permit.
Villa route →What we prepare
- Two design options
- Approval drawings for your choice
Why mezzanine submissions get returned
- Mezzanine built before approval
- No landlord or developer NOC
- Drawings that do not match the unit as built
- Slab and columns not checked for the new loads
- Steel without the approved steel contractor stamp
- Added floor area not shown
- No Civil Defence fire safety drawings
Questions
Questions villa owners ask
Can I submit both options?
You submit the option you choose.
Why prepare two?
To compare before deciding.