Villa · Mezzanine

Lift and Mezzanine in a Villa: One Combined Approval

Adding a mezzanine and a lift together is common in double-height villas. One design and one submission keep them consistent.

A lift and a mezzanine share structure and space, so designing and submitting them together gives one consistent set of drawings for the developer NOC and the building permit. The mezzanine counts as added GFA; the lift needs a slab opening and a pit. Both are checked against the existing structure, and Civil Defence approval is needed.

TogetherOne design, one submission
MezzanineCounts as GFA
LiftSlab opening and pit

What you need to know

  • Shared structure: Shaft and mezzanine designed together.
  • Slab opening: Checked and stamped.
  • One approval round: Fewer revisions.

Documents you will need

  • Title deed and Emirates ID of the owner
  • Approved or as-built drawings of the villa
  • Mezzanine drawings with stamped structural calculations
  • Developer or master community NOC
  • Fire safety drawings for Civil Defence

By situation

Villa mezzanine route by community

We confirm the route for your building and area.

CommunityApproval routeGuides
Nakheel communities (Palm, Jumeirah Park, Jumeirah Islands, Al Furjan)
Nakheel NOC, then Trakhees
Counts as GFA.Trakhees villas
Jumeirah Golf Estates
JGE NOC, then Trakhees
Counts as GFA.JGE
Jebel Ali Village
Nakheel NOC, then Trakhees
Counts as GFA.Jebel Ali Village
Emaar communities such as Arabian Ranches and Dubai Hills
Emaar NOC, then DDA
Counts as GFA.—
Dubai Municipality areas
Approved consultant submits to DM
Counts as GFA.—

How it works

How we get your mezzanine approved

1. Site and slab review

The unit, the existing slab and columns, and what the mezzanine is for.

2. Existing drawings

From the landlord, developer or authority; if missing or out of date, we survey and draw as built.

3. Design and calculations

Mezzanine drawings, steel design and stamped structural calculations, with the added floor area shown.

4. NOC

Landlord, building management or master developer NOC.

5. Permit and Civil Defence

The authority for the area approves the structure; the approved steel contractor stamps the steel; DCD approves fire safety.

6. Build, inspect, complete

The mezzanine is built as approved, inspected, and the completion certificate is issued.

Who does what

Who approves a villa mezzanine

🏘️

Master developer

Gives the NOC for the villa, through its portal or community team.

🏛️

Authority for the community

Dubai Municipality, DDA or Trakhees issues the building permit.

Villa route →
🚒

Dubai Civil Defence

Every mezzanine needs DCD approval.

Civil Defence →

What we prepare

Why mezzanine submissions get returned

  • Mezzanine built before approval
  • No landlord or developer NOC
  • Drawings that do not match the unit as built
  • Slab and columns not checked for the new loads
  • Steel without the approved steel contractor stamp
  • Added floor area not shown
  • No Civil Defence fire safety drawings

Questions

Questions villa owners ask

Can I add a lift and a mezzanine together?

Yes, in one design and submission.

Does the lift count as GFA?

The mezzanine does; the lift needs its own structural checks.