Jumeirah Golf Estates · Mezzanine

Jumeirah Golf Estates Villa Mezzanine Approval: JGE NOC and Trakhees

A mezzanine in a Jumeirah Golf Estates villa needs the JGE NOC, then the Trakhees building permit.

In Jumeirah Golf Estates, including Whispering Pines and the other clusters, a villa mezzanine needs the JGE NOC from the JGE NOC team on behalf of wasl, through the JGE Portal or the Wasl App, then the Trakhees building permit with the same stamped drawings and calculations. It counts as added GFA, and Civil Defence approval is needed.

NOCJGE NOC (Wasl App or JGE Portal)
PermitTrakhees
Counts asAdded GFA

What you need to know

  • All JGE clusters: Whispering Pines, Redwood Avenue, Sienna Lakes and the others.
  • JGE NOC first: Then Trakhees.
  • Structure: Slab and walls checked.

Documents you will need

  • Title deed and Emirates ID of the owner
  • Approved or as-built drawings of the villa
  • Mezzanine drawings with stamped structural calculations
  • Developer or master community NOC
  • Fire safety drawings for Civil Defence

By situation

Villa mezzanine route by community

We confirm the route for your building and area.

CommunityApproval routeGuides
Nakheel communities (Palm, Jumeirah Park, Jumeirah Islands, Al Furjan)
Nakheel NOC, then Trakhees
Counts as GFA.Trakhees villas
Jumeirah Golf Estates
JGE NOC, then Trakhees
Counts as GFA.JGE
Jebel Ali Village
Nakheel NOC, then Trakhees
Counts as GFA.Jebel Ali Village
Emaar communities such as Arabian Ranches and Dubai Hills
Emaar NOC, then DDA
Counts as GFA.—
Dubai Municipality areas
Approved consultant submits to DM
Counts as GFA.—

How it works

How we get your mezzanine approved

1. Site and slab review

The unit, the existing slab and columns, and what the mezzanine is for.

2. Existing drawings

From the landlord, developer or authority; if missing or out of date, we survey and draw as built.

3. Design and calculations

Mezzanine drawings, steel design and stamped structural calculations, with the added floor area shown.

4. NOC

Landlord, building management or master developer NOC.

5. Permit and Civil Defence

The authority for the area approves the structure; the approved steel contractor stamps the steel; DCD approves fire safety.

6. Build, inspect, complete

The mezzanine is built as approved, inspected, and the completion certificate is issued.

Who does what

Who approves a villa mezzanine

🏘️

Master developer

Gives the NOC for the villa, through its portal or community team.

🏛️

Authority for the community

Dubai Municipality, DDA or Trakhees issues the building permit.

Villa route →
🚒

Dubai Civil Defence

Every mezzanine needs DCD approval.

Civil Defence →

What we prepare

Why mezzanine submissions get returned

  • Mezzanine built before approval
  • No landlord or developer NOC
  • Drawings that do not match the unit as built
  • Slab and columns not checked for the new loads
  • Steel without the approved steel contractor stamp
  • Added floor area not shown
  • No Civil Defence fire safety drawings

Questions

Questions villa owners ask

Who approves a mezzanine in Jumeirah Golf Estates?

JGE gives the NOC, Trakhees issues the permit.

Is Whispering Pines the same?

Yes, the same route.

Does it count as GFA?

Yes.